A CDM grid-connected wind project in India with a VVB-verified investment additionality test and a standard jurisdictional grid baseline, but undermined by six material findings on the investment analysis (WACC, sensitivity, data references) and unresolved contradictions between the PDD and monitoring report on baseline method and crediting period. The project delivered roughly 86% of its pro-rata ex-ante expectation, indicating conservative rather than inflated crediting, but documentation quality and transparency gaps limit confidence.
Red Flags
- Six material findings in the validation/verification process, including WACC calculation errors, missing tariff sensitivity analysis, and unsupported input values in the investment analysis, directly undermining the robustness of the additionality claim
- Contradiction between the PDD (project-specific baseline) and the monitoring report (jurisdictional baseline) on the baseline method, with no clear resolution documented
- No verified ERR figure found in the extracted record; only the claimed figure of 96,635 tCO2e from the monitoring report is available, making independent cross-checking impossible
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 97,138 | 0 | 97,138 | |
| Total | 97,138 | 0 | 97,138 |
Risk Indicators
VVB-verified but 6 material findings on investment analysis
Avoidance project, no reversal risk
0% justified for grid-connected wind
Jurisdictional grid EF, but method contradicts validation re
Safeguards and benefit sharing mentioned, no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →