Grid Connected Wind Power Project - Bundle 3
#946of 1935 in Renewable energy#479of 975 in India#688of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM wind power project in India with a VVB-confirmed investment additionality test and a standard jurisdictional grid-emission-factor baseline, but the available record is limited to validation-stage documents with no monitoring or verification data. A 10× discrepancy in the claimed emission reduction between the PDD and the validation report, combined with nine material findings at validation and low extraction confidence, materially weaken confidence in the credit quantity and data reliability.
Red Flags
- The PDD states a total emission reduction of 99,440 tCO₂e while the validation report (same date, 2014-10-07) states 9,944 tCO₂e — a tenfold discrepancy that is unresolved in the available record.
- Nine material findings were raised during validation, including five corrective-action requests (missing DNA approval letter, missing MoC, incomplete PDD baseline and metering description, non-compliant operating-margin calculation, and missing investment-analysis inputs).
- No monitoring reports, verification reports, or verified emission-reduction figures are present in the extracted record; the project's actual performance over its 2014–2024 crediting period cannot be assessed.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines the reliability of the structured data.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Negligible for grid-connected wind
Jurisdictional grid EF, standard CDM
Mentioned but FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →