Grid connected wind Power Project in Jodhpur, Rajasthan

CDM-6930 ↗

#681of 1935 in Renewable energy#338of 975 in India#469of 1459 in CDM (UNFCCC)#239of 806 in AMS-I.D

5.5/ 10
Integrity
6.5
Transparency
4.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A CDM wind power project in Rajasthan with a VVB-confirmed investment additionality test and a straightforward grid-displacement baseline. However, the absence of any monitoring or verification data, a 2009 grid emission factor that may overstate current reductions, and a contradiction between the PDD and validation report on baseline methodology limit confidence in the claimed 101,720 tCO₂e over the 10-year crediting period.

Red Flags

  • No monitoring or verification report data is available in the extracted record; the 101,720 tCO₂e figure is an ex-ante estimate with no verified counterpart to confirm actual delivery.
  • The grid emission factor of 0.922485 tCO₂/MWh is from 2009; if India's grid has decarbonised since, the baseline may overstate the project's marginal reduction.
  • Contradiction between the PDD (jurisdictional baseline) and the validation report (project-specific baseline) creates ambiguity about which baseline methodology was ultimately applied.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, no physical pathway

Baseline

Method contradiction; 2009 grid EF

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS ID

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents