Grouped Commercial Vehicle EV Project in India
#522of 975 in India#656of 1339 in Verra (VCS)
Audit Analysis
A VCS-registered commercial vehicle EV project in India with VVB-verified additionality and smart-meter monitoring, but undermined by a 1,000-fold discrepancy between the PDD and validation report on total emission reductions, an unresolved energy-source contradiction, and the absence of a stated buffer pool or quantified leakage analysis. The project's integrity is moderate: additionality is confirmed and no reversal risk applies, yet the baseline is project-specific and several key parameters (FNRB, usage rates, CORSIA/CCP status) are not documented.
Red Flags
- The PDD reports a total ERR of 70,520 while the validation report reports 65 — a 1,000-fold discrepancy that cannot be reconciled without confirming whether the figures are in different units (kg vs tCO₂e) or represent different time bases; this creates serious uncertainty about the true credit volume.
- Energy source is stated as 'grid' in the validation report but 'mixed' in the PDD; if the baseline actually includes a renewable component (consistent with the AMS.I.F methodology), the grid-only baseline may overstate reductions.
- 12 Corrective Action Requests were raised during verification, indicating significant documentation or methodology issues that had to be resolved before issuance.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 65 | 0 | 65 | |
| Total | 65 | 0 | 65 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' without quantification
Project-specific measured baseline; reassessment timing not stated
Grievance mechanism present; FPIC not documented
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →