Grouped Rooftop Solar Project by Tata Power Renewable Energy Limited
#613of 1935 in Renewable energy#303of 975 in India#346of 1339 in Verra (VCS)
Audit Analysis
A VCS rooftop solar project (AMS.I.F v5.0) in India with VVB-confirmed additionality and smart-meter monitoring, but hampered by a project-specific baseline, a 0% leakage deduction with weak justification, and a material finding that actual reductions were roughly 70% below the project's own period estimate due to uncommissioned installations. The project is under-crediting relative to its ex-ante expectations, which mitigates over-crediting risk but signals implementation gaps.
Red Flags
- Material finding in the verification report: actual reductions (39,343 tCO2e) are approximately 70.39% lower than the period estimate (130,360 tCO2e) due to uncommissioned instances, indicating significant implementation shortfall.
- Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report, despite the monitoring report claiming it was 'deemed negligible' — an inconsistency that weakens the leakage treatment.
- Baseline method is recorded as 'project' in the verification report but 'jurisdictional' in the monitoring report, creating uncertainty about the actual baseline approach.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 440 | 0 | 440 | |
| 2021 | 8,607 | 0 | 8,607 | |
| 2022 | 14,140 | 0 | 14,140 | |
| 2023 | 27,119 | 0 | 27,119 | |
| 2024 | 2,003 | 25 | 1,978 | |
| Total | 52,309 | 25 | 52,284 |
Risk Indicators
VVB-confirmed investment test
low inherent risk for solar
0% deduction, justification inconsistent across documents
Project-specific baseline; method contradicted across documents
FPIC conducted, grievance mechanism present, safeguards documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →