GS 1220 Ecological Stoves for Better Living - Micro Scale PoA - VPA1 Bolivia

GS-133 ↗

5.3 / 10
Integrity
5.4
Transparency
5.6
Claim Safety
5.0
Documentation
5.2

Score Breakdown

Integrity

verified The project uses a combined additionality test, which is stronger than a single weak test, and no material findings were reported in the verification record.

missing Leakage is only described as quantified with a 0% deduction, while reversal events are noted as not addressed and no buffer pool percentage is available.

Transparency

verified The monitoring report and verification report both provide usage-rate information and a defined monitoring period, which helps traceability.

missing The VVB name is not stated in the extracted record, and the key usage-rate and usage-monitoring-method values conflict across documents.

Claim Safety

verified The project applies a project-specific baseline and includes a quantified leakage treatment, which is better than an unbounded baseline claim.

missing The conflicting usage-rate figures between the 2018 verification report and the 2021 monitoring report raise over-crediting risk, and CORSIA eligibility is not stated.

Documentation

verified Five documents were used, including a PDD, monitoring report, and verification report, and extraction confidence is high.

missing The record does not state the VVB name, and the crediting period is much longer than the monitoring period shown, leaving recency and completeness gaps.

Detailed Analysis

Integrity

The project appears to have a documented combined additionality test, and the verification record reports no material findings or corrective actions. However, permanence is weaker because reversal events are not addressed and no buffer pool percentage is provided, even though this is a stove project rather than a removal project. Leakage is treated with a 0% deduction and a quantified justification, but the overall robustness is reduced by the limited permanence evidence.

Transparency

The monitoring period is clearly stated, and both the verification and monitoring records provide usage-rate information, which supports traceability. That said, the VVB name is not found in the extracted record, which limits auditability. Transparency is also weakened by the conflicting usage-rate and monitoring-method values across documents, suggesting the public record is not fully consistent.

Claim Safety

Claim safety is moderate because the project uses a project-specific baseline and reports a quantified leakage treatment. The main risk is the contradiction on usage rates: the older verification report shows 0.9, while the later monitoring report shows 0.75, and the same later report is also the source for the assumed usage rate of 0.75. I privileged the later monitoring report for operational parameters because it is more recent and likely reflects current performance, but the discrepancy still lowers confidence in the claimed reductions. CORSIA eligibility is not stated, so dual-market claim risk cannot be ruled out from the extracted record.

Documentation

Documentation is reasonably broad, with five documents used and high extraction confidence overall. The presence of FPIC, a grievance mechanism, and benefit-sharing language is positive for completeness. Still, the VVB name is missing, and the long crediting period relative to the monitoring period leaves a gap in how current the evidence is for the claimed issuance window.

Overall

Overall, I privileged the later monitoring report for the usage-rate and usage-monitoring-method values because it is more recent than the 2018 verification report and likely reflects the latest operating data. Even so, the contradiction between 0.9 and 0.75 is material and reduces reliability, so the score is held to the mid-range rather than higher. The project also lacks clear evidence on reversal handling and does not state CORSIA eligibility, which further limits confidence in the claim.

Audit Analysis

This is a Gold Standard household energy-efficiency project with some strong safeguards and a documented additionality approach, but the evidence base is uneven. The biggest concern is inconsistent usage-rate evidence across documents, which creates uncertainty about emission reductions and claim accuracy.

Project Description

Developer: myclimate Foundation Type: Energy Efficiency - Domestic Size: Microscale Methodology: GS TPDDTEC v 1. Crediting period: 2012-06-19 → 2022-06-18 Estimated annual credits: 7623 tCO2e SDGs: Goal 1: No Poverty, Goal 17: Partnerships for the Goals, Goal 13: Climate Action, Goal 7: Affordable and Clean Energy, Goal 3: Good Health and Well-Being, Goal 12: Responsible Production and Consumption, Goal 5: Gender Equality, Goal 8: Decent Work and Economic Growth, Goal 4: Quality Education, Goal 15: Life On Land

Red Flags

  • Usage-rate evidence conflicts between the verification report and the monitoring report, with 0.9 in the older verification report versus 0.75 in the later monitoring report.
  • Reversal risk is not clearly addressed and no buffer pool share is stated, which weakens permanence confidence even for a stove project.

Credit Vintages Exhausted

Issued Retired Available
2012
1,493 1,493 0
2013
3,096 3,096 0
2014
3,116 3,116 0
2015
3,204 3,204 0
2016
3,060 3,060 0
2017
2,816 2,816 0
2018
2,374 2,374 0
2019
2,301 2,301 0
2020
1,906 1,906 0
Total 23,366 23,366 0

Cosa migliorerebbe questo punteggio

  • Publish a reconciled monitoring note explaining the usage-rate change from 0.9 to 0.75 and the shift from telephone survey to annual survey, with a clear rationale for which value governs issuance.
  • Add explicit permanence and market-claim documentation, including buffer pool treatment or reversal handling and a clear statement on CORSIA eligibility and any CCP status.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Combined test present, not VVB-confirmed

Permanence

No buffer pool stated; reversals not addressed

Leakage

Quantified 0% leakage deduction

Baseline

Project baseline stated, reassessment timing missing

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA eligibility not stated; CCP not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti