GS1005 Qori Q'oncha - Improved cookstoves diffusion programme in Peru - VPA2
GS-43 ↗ · current registry ID: GS1049
#108of 202 in Industrial#7of 14 in Peru#267of 426 in Gold Standard (GS)
Audit Analysis
The Qori Q'oncha cookstove programme in Peru is a long-running Gold Standard project with VVB-confirmed additionality and a recently reassessed baseline, but it carries significant integrity concerns including a 63.43% old-stove removal rate (below the 80% threshold), no buffer pool, a 0% leakage deduction, and an extensive list of material findings and corrective actions spanning data inconsistencies, missing maintenance, and beneficiary dismantling of stoves. The project over-delivers relative to its ex-ante estimate, which is a positive for claim safety, but the sheer volume of compliance issues and documentation gaps temper confidence in the overall credit quality.
Red Flags
- GRM removal rate of old stoves is 63.43%, below the 80% threshold, undermining the additionality premise that baseline stoves are being displaced
- No buffer pool is in place despite the absence of a permanence mechanism for a project with reported stove dismantling by beneficiaries
- Leakage deduction is 0% with a 'quantified' justification, yet the project-specific baseline and lack of jurisdictional data make the zero-leakage claim difficult to substantiate
- Annual monitoring reports for 2018, 2019, and 2020 were not submitted as required by Gold Standard, creating a multi-year data gap
- Double-counting risks were identified due to repeated or absent IDs in end-user lists, raising the possibility of over-crediting
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 13,402 | 13,402 | 0 | |
| 2011 | 31,097 | 31,097 | 0 | |
| 2012 | 111,428 | 110,339 | 1,089 | |
| 2013 | 186,618 | 186,618 | 0 | |
| 2014 | 186,013 | 182,166 | 3,847 | |
| 2015 | 165,749 | 165,704 | 45 | |
| 2016 | 241,592 | 241,592 | 0 | |
| 2017 | 218,336 | 212,562 | 5,774 | |
| 2018 | 95,298 | 58,543 | 36,755 | |
| 2019 | 103,226 | 91,283 | 11,943 | |
| 2020 | 112,101 | 2,000 | 110,101 | |
| 2021 | 79,057 | 1,030 | 78,027 | |
| 2022 | 59,906 | 0 | 59,906 | |
| 2023 | 32,673 | 18,289 | 14,384 | |
| Total | 1,636,496 | 1,314,625 | 321,871 |
Risk Indicators
VVB-confirmed barrier test, but 63.43% removal rate below 80
No buffer pool; no reversal events reported (efficiency proj
0% deduction with 'quantified' justification; project-specif
Project-specific baseline reassessed in 2023 with new survey
Grievance mechanism present (added after CAR); safeguards me
CORSIA eligibility not stated; CCP status not mentioned; dua
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →