GS11191 VPA-1 Biolite Improved Charcoal Stoves in Kenya
GS-3181 ↗ · current registry ID: GS11193
#496of 1329 in Industrial#58of 157 in Kenya#793of 1801 in Gold Standard (GS)#97of 189 in AMS-II.G
Audit Analysis
The BioLite Improved Charcoal Stoves project in Kenya is a methodologically sound energy-efficiency intervention with VVB-confirmed additionality and a quantified 5% leakage deduction, but it is undermined by an unusually large volume of material findings and corrective actions spanning MR parameter inconsistencies, missing supporting documents, and database errors. The project-specific baseline and absence of a buffer pool, combined with the lack of a lifetime ex-ante ERR figure for pro-rata comparison, limit confidence in the robustness of the credit claims.
Red Flags
- Over 50 material findings and 40+ corrective actions identified across verification and validation reports, including hard-coded ER parameters without traceable calculations, missing WBT records, and database linking errors affecting stove counts across multiple VPAs
- Crediting period discrepancy: the 2022 verification report states 2021–2033 while the 2024 validation report states 2018–2038, creating uncertainty about the applicable crediting window
- total_err_exante_lifetime is not available in the extracted record, preventing a pro-rata over- or under-delivery assessment against the lifetime estimate
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 46,104 | 46,104 | 0 | |
| 2022 | 36,194 | 35,471 | 723 | |
| 2023 | 38,868 | 0 | 38,868 | |
| Total | 121,166 | 81,575 | 39,591 |
Risk Indicators
VVB-confirmed combined test
no reversals
5% quantified deduction
Project-specific, measured, reassessed 2024
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →