Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS11638 GS11640 RVPA-3 SPOUTS Water Purifier Programme in Africa- WPS in Uganda by AERA- VPA 5

GS-3971 ↗ · current registry ID: GS12052

#80of 1329 in Industrial#7of 163 in Uganda#183of 1801 in Gold Standard (GS)

5.9/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
6.5
Documentation
5.5

Audit Analysis

A Gold Standard water purification project in Uganda with a VVB-confirmed combined additionality test, quantified 5% leakage deduction, and strong social safeguards (FPIC, grievance mechanism, benefit sharing). The project delivered 163% of its pro-rata ex-ante expectation for the first monitoring period, indicating a conservative baseline. However, the absence of a stated buffer pool, a project-specific (non-jurisdictional) baseline, 16 material findings during verification, and two still-open corrective actions temper the overall assessment.

Red Flags

  • Two corrective actions remain open at the time of the verification report (October 2024): updating the KPI table with validated VPA names/IDs and correcting inconsistent emission reduction values in the Monitoring Report
  • 16 material findings were raised during verification, including typographical errors in survey data, an inconsistency in filter replacement counts (189 vs 25), and missing supporting documents for WHO compliance — all resolved but indicating a high volume of data-quality issues
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2023
33,9524,10629,846
2024
12,959012,959
Total46,9114,10642,805

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversal data

Leakage

5% quantified deduction

Baseline

Project-specific; no reassessment date

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents