Skip to main content
GSEnergy Efficiency - DomesticCongoGeneral Methodologyv2.1

GS1205 Sustainable Energy for Development PoA, VPA 3: Improved Cook Stove Project in Brazzaville

GS-400 ↗ · current registry ID: GS2514

#684of 1329 in Industrial#1034of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
5.2
Transparency
4.5
Claim Safety
4.5
Documentation
5.0

Audit Analysis

This improved cook stove project in Brazzaville, Congo, has a reasonable safeguards framework (FPIC, grievance mechanism, benefit sharing) and no material findings, but suffers from significant data gaps and internal contradictions. The project-specific baseline, unaddressed leakage, and inconsistent FNRB methodology across documents raise moderate over-crediting risk. Multiple discrepancies in ERR figures and usage rates between monitoring reports undermine confidence in the reported results.

Red Flags

  • Two different verified ERR values (15,302 vs 10,529) appear in 2016 monitoring reports for what appears to be the same period, with no explanation for the discrepancy
  • Leakage deduction and justification are entirely absent from all available documents despite cook stoves displacing fuel that could be redirected to other uses
  • FNRB methodology is inconsistent: the PDD (2016) specifies a local field measurement while the 2019 monitoring report uses a national default, with no documented rationale for the change
  • VVB name is not stated in any available document, making independent verification of additionality and monitoring results impossible to confirm

Credit Vintages

IssuedRetiredAvailable
2014
3,0953,0950
2015
6,1256,1250
2016
4,3391,3043,035
Total13,55910,5243,035

Risk Indicators

Additionality

Combined test applied but VVB verification not confirmed

Permanence

mixed evidence / unresolved risk

Leakage

No leakage deduction or justification in any document

Baseline

Project-specific baseline, no reassessment date found

Safeguards

FPIC, grievance mechanism, benefit sharing all documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents