Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS1247 VPA 106 Improved Kitchen Regimes: Kayonza District Borehole Project, Rwanda

GS-976 ↗ · current registry ID: GS5392

#1055of 1329 in Industrial#95of 139 in Rwanda#1497of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
3.5
Documentation
4.5

Audit Analysis

This Gold Standard borehole/kitchen project in Rwanda has VVB-confirmed additionality and basic safeguards (FPIC, grievance mechanism), but is undermined by 11 cross-document contradictions on key parameters (leakage, fNRB, usage rate, crediting period), the absence of any buffer pool, and a large backlog of open corrective actions. The ERR figures cannot be reliably reconciled across documents, and the 0% leakage deduction is contradicted by a 5% figure in the PDD, raising material concerns about the robustness of the credit claims.

Red Flags

  • 11 contradictions across documents on leakage justification, fNRB value, usage rate, crediting period, and other key parameters severely undermine data reliability
  • Leakage deduction is 0% in the 2021 monitoring report but 5% in the 2023 PDD, with the justification shifting from 'quantified' to 'deemed negligible' — an unresolved inconsistency
  • Five Forward Action Requests (FAR 01–05) remain open, including the requirement to submit an fNRB report at VPA level and demonstrate monitoring applicability
  • Crediting period is stated as 2015–2022 in the verification report but 2025–2030 in the 2025 validation report, creating ambiguity about which period the monitoring data applies to

Credit Vintages Exhausted

IssuedRetiredAvailable
2015
2842840
2016
10,00010,0000
2017
10,00010,0000
2018
10,00010,0000
2019
8,5458,5450
2020
3,2103,2100
Total42,03942,0390

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

breakdowns reported

Leakage

0% vs 5% contradiction; justification inconsistent

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents