GS1247 VPA 127 Southern Ethiopia Community Boreholes
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB in the verification report, and the project reports no material findings or required corrective actions.
missing Permanence is not well evidenced: reversal events are not addressed and no buffer pool percentage is available in the extracted record.
Transparency
verified The monitoring period is stated, the VVB is named, and the monitoring approach uses annual surveys for usage tracking.
missing The record does not provide verified ER issuance, and the baseline was not shown as recently reassessed.
Claim Safety
verified Leakage is explicitly quantified with a 0% deduction and the justification is described as quantified.
missing The project-specific baseline and missing CORSIA/CCP clarity leave some over-crediting and double-claim risk unresolved.
Documentation
verified The extracted record draws on five documents, including the PDD, monitoring report, verification report, and appendix, with high extraction confidence.
missing The crediting period is long relative to the single monitoring period shown, and key fields such as buffer pool and baseline reassessment are not found.
Detailed Analysis
Integrity
The verification report confirms additionality through the VVB, and it reports no material findings or corrective actions required. Leakage is handled with a quantified deduction of 0%, which supports integrity. The main weakness is permanence: reversal events are not addressed, and no buffer pool percentage is available in the extracted record.
Transparency
The documentation identifies the VVB, the monitoring period, and the annual survey method used to monitor usage. However, total verified ERRs are not found in the extracted record, and the baseline was not shown as having been reassessed. That leaves the public audit trail incomplete even though the core monitoring framework is visible.
Claim Safety
Claim safety is helped by the quantified 0% leakage deduction and the fact that verified usage is reported at 100% versus an assumed 100%. Still, the baseline is project-specific rather than clearly standardized, and the record does not state CORSIA eligibility while CCP status is only not mentioned. Those gaps keep over-crediting and double-claim risk from being fully resolved.
Documentation
Documentation quality is fairly strong because five source documents were used and extraction confidence is high. The record also includes the PDD, monitoring report, verification report, and appendix, which improves traceability. Even so, several important fields remain absent, including buffer pool coverage and baseline reassessment timing, and the verified issuance total is not available.
Overall
There are no listed contradictions in the extracted record, so no conflict-resolution penalty is needed. I privileged the verification report for additionality and findings because it is the highest-priority assurance document in the set. The project scores moderately well overall, but missing permanence, registry-status, and issuance details prevent a higher confidence rating.
Audit Analysis
The project has some solid quality signals, including VVB-confirmed additionality, no material findings, and a quantified leakage deduction of 0%. However, the baseline is project-specific rather than clearly reassessed, permanence is not well addressed, and the record does not show a verified issuance figure or a clear CORSIA/CCP status. Overall, this looks moderately credible but with meaningful evidence gaps that limit claim confidence.
Project Description
Developer: CO2balance UK ltd Type: Energy Efficiency - Domestic Size: Micro Scale Crediting period: 2017-06-22 → 2024-06-21 Estimated annual credits: 10000 tCO2e SDGs: Goal 3: Good Health and Well-Being, Goal 5: Gender Equality, Goal 13: Climate Action, Goal 6: Clean Water and Sanitation
Red Flags
- Permanence is weakly documented: reversal events are noted as not addressed and no buffer pool percentage is found.
- Claim safety is limited by missing registry-status clarity: CORSIA eligibility is not found and CCP status is only not mentioned.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 4,871 | 4,871 | 0 | |
| 2018 | 10,000 | 10,000 | 0 | |
| 2019 | 4,662 | 4,662 | 0 | |
| 2020 | 5,012 | 5,012 | 0 | |
| 2021 | 2,918 | 2,888 | 30 | |
| 2022 | 1,927 | 447 | 1,480 | |
| 2023 | 438 | 0 | 438 | |
| Total | 29,828 | 27,880 | 1,948 |
Cosa migliorerebbe questo punteggio
- Publish a clear issuance and registry-status trail, including verified ERR totals and explicit CORSIA/CCP eligibility statements.
- Document permanence and baseline robustness more fully by showing buffer pool coverage, reversal treatment, and any baseline reassessment.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No buffer pool shown
0% quantified leakage deduction
Project baseline, reassessment not shown
Grievance mechanism present, FPIC not found
CORSIA/CCP status not clearly stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- PoA GS1247 Annual-Report - signed.pdf
- Monitoring Report_1st monitoring period_22.06.2017 to 08.05.2018_v3.pdf
- Annual Report ETHIOPIA Safe Water SNNPR_2023_V2(3).pdf
- Monitoring Report_3rd monitoring period_09.05.2019 to 25.03.2020_v5.pdf
- (1)Monitoring Report_2nd monitoring period_09.05.2018 to 08.05.2019_v1.pdf
pdd
validation
- CO2b User Numbers Deviation-Request-Form v1_Final decision.pdf
- GS1247_PoA-DD Clean_CP2_Improved Kitchen_19-02-2025.pdf
- GS1247_Internal_Validation_PoA_13062013_final.pdf
- Verification Report_3rd monitoring period_09.05.2019 to 25.03.2020.pdf
- DEV_255 (1).pdf
- Transition Annex_11.06.2017_v2.1.pdf
- +5 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →