GS1247 VPA 13 Improved Kitchen Regimes MUSENYI (Bugesera), Rwanda
GS-589 ↗ · current registry ID: GS3446
#686of 1329 in Industrial#48of 139 in Rwanda#1036of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard improved-cookstove VPA in Bugesera, Rwanda has VVB-confirmed additionality and a recently reassessed baseline, but is undermined by a verified usage rate of 23.3% against a 90% PDD assumption, a 0% leakage deduction that is difficult to justify for a household energy-efficiency project, and a large volume of unresolved material findings and cross-document contradictions. The project is operational and monitored, but the gap between design assumptions and field reality, combined with documentation inconsistencies, limits confidence in the robustness of the credit claims.
Red Flags
- Verified usage rate of 23.3% is only about one-quarter of the 90% assumed in the PDD, indicating the design-phase adoption assumption was severely over-optimistic and raising questions about whether the claimed ERR of 13,090 tCO₂ already reflects the low actual usage rate.
- Leakage deduction of 0% with a 'deemed negligible' justification is inconsistent with the PDD's own 5% leakage provision and with the expected behaviour of households who may continue using traditional stoves alongside improved ones.
- Twelve cross-document contradictions were identified across leakage treatment, ERR figures, usage rates, fNRB values, crediting-period dates, and benefit-sharing descriptions, indicating poor internal consistency in the project documentation.
- The total verified ERR figure is not present in the extracted record; only the claimed figure of 13,090 tCO₂ is available, preventing an independent over- or under-delivery check.
- Dozens of material findings and corrective actions remain open, including unresolved FAR items on SDG indicators, fNRB reporting at VPA level, and monitoring-option justification.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 1,557 | 1,557 | 0 | |
| 2015 | 9,837 | 9,837 | 0 | |
| 2016 | 10,000 | 10,000 | 0 | |
| 2017 | 9,863 | 9,805 | 58 | |
| 2018 | 8,791 | 8,617 | 174 | |
| 2019 | 6,118 | 6,004 | 114 | |
| 2020 | 2,240 | 2,236 | 4 | |
| 2021 | 1,008 | 1,008 | 0 | |
| Total | 49,414 | 49,064 | 350 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' – weak justification
Project-specific, reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not explicitly excluded
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →