GS1247 VPA 136 Zoba Maekel Community Boreholes

GS-1109 ↗ · current registry ID: GS6237

#208of 1329 in Industrial#4of 38 in Eritrea#364of 1801 in Gold Standard (GS)

5.5/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A Gold Standard community borehole project in Eritrea with VVB-confirmed additionality and no reversal events, but undermined by the absence of a buffer pool, a 0% leakage deduction contradicted by the PDD's 5% figure, a 14% fNRB discrepancy between documents, and a long list of open corrective actions including double-counting and monitoring-compliance issues. The verified ERR matches the claimed figure exactly for the 2023–2024 monitoring period, but the underlying parameter contradictions reduce confidence in the credit quantity.

Red Flags

  • No buffer pool or permanence mechanism identified in any available document, leaving reversal risk unmitigated for a community water infrastructure project
  • Leakage deduction of 0% in the 2023 monitoring report contradicts the PDD's 5% deduction; the justification ('deemed negligible') is not supported by a quantified analysis
  • fNRB value of 0.97 (monitoring report) vs 0.85 (PDD) represents a 14% discrepancy that directly inflates credit quantities if the higher value is used
  • Double-counting of users for proximate boreholes (ZMA 054/055, ZMA 056/057) was identified as a material finding and required corrective action
  • Multiple open FARs (SDG indicators at VPA level, fNRB report, monitoring justification) remain unresolved as of the latest verification

Credit Vintages

IssuedRetiredAvailable
2017
5305300
2018
10,0008,8101,190
2019
4,8294,8290
2020
4,3581,9752,383
2021
4,5912,0432,548
2022
5,5632,4703,093
Total29,87120,6579,214

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

no reversals yet

Leakage

0% deduction contradicted by PDD 5%

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents