GS1247 VPA 144 Manicaland Safe Water
GS-1126 ↗ · current registry ID: GS6520
#876of 1329 in Industrial#8of 9 in Zimbabwe#1292of 1801 in Gold Standard (GS)
Audit Analysis
The Manicaland Safe Water project (GS1247 VPA 144) is a Gold Standard safe-water borehole project verified by Carbon Check (India) with a VVB-confirmed combined additionality test and no reported reversal events. However, the project is undermined by eleven cross-document contradictions (including leakage deduction of 0% vs 5%, fNRB of 0.97 vs 0.85, and two different crediting periods), an ongoing investigation into two staff members, a delayed revalidation, and 49.1 non-functional borehole days during the monitoring period. The methodology (TPDDTEC, designed for thermal-energy displacement) is applied to safe-water infrastructure, raising baseline-validity questions, and the absence of a buffer pool leaves permanence protection thin.
Red Flags
- Eleven contradictions across documents, including leakage deduction (0% in verification report vs 5% in PDD), fNRB (0.97 vs 0.85), and two non-overlapping crediting periods (2018–2023 vs 2025–2030), indicating significant data-reliability issues.
- Ongoing investigation into two staff members within the Zimbabwean partner organisation, reported in the verification report material findings.
- 49.1 non-functional days recorded across all boreholes during the 2024 monitoring period, undermining the permanence and reliability of the water-supply claim.
- Revalidation to transition to the ERS DWS methodology is incomplete and delayed due to the Government of Zimbabwe's Carbon Framework, with a deviation extending the timeline to 31 December 2024.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 5,644 | 5,644 | 0 | |
| 2019 | 8,612 | 5,588 | 3,024 | |
| 2020 | 7,218 | 6,512 | 706 | |
| 2021 | 5,242 | 1,240 | 4,002 | |
| 2022 | 1,865 | 0 | 1,865 | |
| Total | 28,581 | 18,984 | 9,597 |
Risk Indicators
VVB-confirmed combined test
49; 1 non-functional days
0% deduction contradicts PDD 5%
Project-specific; methodology fit questionable
FPIC, grievance mechanism, benefit sharing
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →