GS1247 VPA 146 Manicaland Safe Water
GS-1128 ↗ · current registry ID: GS6522
#1056of 1329 in Industrial#9of 9 in Zimbabwe#1498of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe-water VPA in Zimbabwe has a VVB-verified additionality assessment and no reported reversals, but is undermined by ten cross-document contradictions (leakage, fNRB, crediting period, ERR), five open Forward Action Requests, an ongoing staff investigation, and temporary parameter caps imposed during a grievance review. The project sits in a transitional state with revalidation delayed by the Zimbabwean government's carbon framework, creating meaningful uncertainty around the validity of current credit claims.
Red Flags
- Ten contradictions across documents, including leakage deduction (0% in verification report vs 5% in PDD vs 'quantified' in monitoring report), fNRB (0.97 vs 0.85), and crediting period (2018–2023 vs 2025–2030)
- Five Forward Action Requests (FAR 01–05) remain open, covering SDG indicators, fNRB reporting, and monitoring justification
- Ongoing investigation into two staff members within the Zimbabwean partner organisation, noted in the verification report
- Temporary caps on borehole yield, project yield, usage rate, and user numbers imposed due to an active Gold Standard grievance review
- Crediting period gap: the verification report (Oct 2023) shows the period ending June 2023, while the validation report (Aug 2025) shows a new period starting May 2025; the 2024 monitoring period falls in the gap
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 5,671 | 5,671 | 0 | |
| 2019 | 8,774 | 5,636 | 3,138 | |
| 2020 | 7,370 | 4,399 | 2,971 | |
| 2021 | 7,135 | 1,534 | 5,601 | |
| 2022 | 3,585 | 0 | 3,585 | |
| Total | 32,535 | 17,240 | 15,295 |
Risk Indicators
VVB-verified combined test
mixed evidence / unresolved risk
0% deduction contradicted by PDD (5%) and monitoring report
Project-specific baseline, reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →