Skip to main content
GSEnergy Efficiency - DomesticZimbabweGeneral Methodologyv2.1

GS1247 VPA 146 Manicaland Safe Water

GS-1128 ↗ · current registry ID: GS6522

#1056of 1329 in Industrial#9of 9 in Zimbabwe#1498of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.2
Transparency
5.0
Claim Safety
4.0
Documentation
3.5

Audit Analysis

This Gold Standard safe-water VPA in Zimbabwe has a VVB-verified additionality assessment and no reported reversals, but is undermined by ten cross-document contradictions (leakage, fNRB, crediting period, ERR), five open Forward Action Requests, an ongoing staff investigation, and temporary parameter caps imposed during a grievance review. The project sits in a transitional state with revalidation delayed by the Zimbabwean government's carbon framework, creating meaningful uncertainty around the validity of current credit claims.

Red Flags

  • Ten contradictions across documents, including leakage deduction (0% in verification report vs 5% in PDD vs 'quantified' in monitoring report), fNRB (0.97 vs 0.85), and crediting period (2018–2023 vs 2025–2030)
  • Five Forward Action Requests (FAR 01–05) remain open, covering SDG indicators, fNRB reporting, and monitoring justification
  • Ongoing investigation into two staff members within the Zimbabwean partner organisation, noted in the verification report
  • Temporary caps on borehole yield, project yield, usage rate, and user numbers imposed due to an active Gold Standard grievance review
  • Crediting period gap: the verification report (Oct 2023) shows the period ending June 2023, while the validation report (Aug 2025) shows a new period starting May 2025; the 2024 monitoring period falls in the gap

Credit Vintages

IssuedRetiredAvailable
2018
5,6715,6710
2019
8,7745,6363,138
2020
7,3704,3992,971
2021
7,1351,5345,601
2022
3,58503,585
Total32,53517,24015,295

Risk Indicators

Additionality

VVB-verified combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction contradicted by PDD (5%) and monitoring report

Baseline

Project-specific baseline, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents