GS1247 VPA 151 Improved Kitchen Regimes: Gatsibo District Borehole Project, Rwanda
GS-1451 ↗ · current registry ID: GS6786
#47of 1329 in Industrial#3of 139 in Rwanda#127of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard improved-kitchen project in Rwanda with VVB-confirmed additionality and a recently reassessed (2024) project-specific baseline. The project shows no reversal events and conservative usage-rate assumptions, but the absence of a stated buffer pool, a 0% leakage deduction justified only as 'deemed negligible,' and multiple cross-document contradictions in FNRB, ERR, and crediting-period data temper confidence in the overall data integrity.
Red Flags
- Leakage deduction is 0% with only a 'deemed negligible' justification, while an earlier (2019) monitoring report described leakage as 'quantified' — the shift is unexplained
- Nine cross-document contradictions were identified, including conflicting FNRB values (0.98 vs 0.85), conflicting FNRB methods (national default vs local field), and conflicting crediting periods (2014–2024 vs 2025–2030)
- CORSIA eligibility is not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 8,557 | 8,557 | 0 | |
| 2018 | 9,196 | 9,196 | 0 | |
| 2019 | 6,296 | 6,296 | 0 | |
| 2020 | 5,253 | 5,253 | 0 | |
| 2021 | 510 | 510 | 0 | |
| Total | 29,812 | 29,812 | 0 |
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction, 'deemed negligible' only
Project-specific, reassessed 2024
FPIC, grievance, benefit-sharing documented
CORSIA not stated; CCP not mentioned
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →