Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS1247 VPA 152 Improved Kitchen Regimes: Gatsibo District Borehole Project, Rwanda

GS-1444 ↗ · current registry ID: GS6787

#67of 1329 in Industrial#5of 139 in Rwanda#157of 1801 in Gold Standard (GS)

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

This Gold Standard improved cookstove project in Rwanda demonstrates solid additionality (combined test, VVB-verified) and no reversal events, but suffers from multiple parameter contradictions across documents (leakage, FNRB, usage rate, monitoring method) that reduce confidence in the exact credit quantity. The verified ERR substantially exceeds the claimed figure, suggesting over-delivery rather than over-crediting, though the absence of a buffer pool for reversion risk in an energy-efficiency project is a notable gap.

Red Flags

  • Nine contradictions across documents on key parameters (leakage, FNRB, usage rate, monitoring method, crediting period, benefit sharing) indicate inconsistent record-keeping
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
  • Crediting period contradiction: the 2020 monitoring report references 2014–2021 while the 2025 validation report establishes 2025–2030, with the 2023–2024 monitoring period falling outside both stated windows

Credit Vintages Exhausted

IssuedRetiredAvailable
2017
8,8608,8600
2018
8,9968,9960
2019
4,6144,6140
2020
3,5093,5090
2021
3403400
Total26,31926,3190

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversion risk unmitigated

Leakage

Contradictory: 0% vs 5% across documents

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents