GS1247 VPA 16 Improved Kitchen Regimes: Mwogo (Bugesera), Rwanda
GS-594 ↗ · current registry ID: GS3449
#878of 1329 in Industrial#73of 139 in Rwanda#1294of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove project in Rwanda has a VVB-verified additionality assessment and no reversal events, but is undermined by a severe usage-rate gap (design assumption of 90–99% versus verified 23–28%), a 0% leakage deduction with a thin 'deemed negligible' justification, the absence of a buffer pool, and a large backlog of open corrective actions and findings. Eleven cross-document contradictions on key parameters (leakage, fNRB, usage rate, crediting period, benefit sharing) further erode confidence in the data record.
Red Flags
- Verified usage rate of 23.3% (2022 monitoring report) or 28.3% (2021 monitoring report) is dramatically below the PDD design assumption of 90% (or 99% per the verification report material findings), indicating the project is operating at roughly one-quarter of its design capacity.
- Leakage deduction is 0% with a 'deemed negligible' justification, yet the 2025 PDD references a 5% leakage deduction, and the 2020 monitoring report described leakage as 'quantified' — the justification for zero leakage in a cookstove project where users may revert to traditional stoves is not adequately supported.
- Five Forward Action Requests (FAR 01–05) remain open, covering SDG indicator evaluation, fNRB reporting at VPA level, and monitoring justification — unresolved compliance gaps.
- Eleven contradictions across documents on leakage, fNRB value and method, usage rate, ERR figures, additionality test type, benefit sharing, and crediting period create significant data-reliability concerns.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 603 | 601 | 2 | |
| 2015 | 10,000 | 9,939 | 61 | |
| 2016 | 10,000 | 10,000 | 0 | |
| 2017 | 9,835 | 9,805 | 30 | |
| 2018 | 8,630 | 8,458 | 172 | |
| 2019 | 6,006 | 5,894 | 112 | |
| 2020 | 2,199 | 2,195 | 4 | |
| 2021 | 1,107 | 1,107 | 0 | |
| Total | 48,380 | 47,999 | 381 |
Risk Indicators
VVB-confirmed combined test
no reversals reported
0% deduction, thin justification; PDD references 5%
Project-specific baseline; reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →