Skip to main content
GSEnergy Efficiency - DomesticEritreaGeneral Methodologyv2.1

GS1247 VPA 178 Zoba Debub Community Boreholes

GS-1522 ↗ · current registry ID: GS7332

#523of 1329 in Industrial#20of 38 in Eritrea#821of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.0
Transparency
5.5
Claim Safety
4.5
Documentation
5.0

Audit Analysis

A community borehole project in Eritrea displacing thermal energy for water heating, with VVB-confirmed additionality and no reversal events, but undermined by a significant baseline water-boiling-test correction, a usage-rate contradiction (95% applied vs. a 90% cap mandated by the BAMG), a leakage-deduction discrepancy between the PDD (5%) and the verification report (0%), and a long list of open corrective actions and forward action requests that raise data-reliability concerns.

Red Flags

  • Baseline Water Boiling Test value corrected from 0.3 kg to 0.8892 kg because the original test inadvertently used kerosene; the correction was required as a CAR and indicates the initial baseline was materially misstated.
  • Usage rate of 95% was applied in the 2024 verification report, yet the material findings record a BAMG-mandated cap of 90%, implying a ~5.6% over-claim for the period.
  • Leakage deduction is 0% in the 2024 verification report ('deemed negligible') but the PDD (2023) specified a 5% deduction; the justification for the change is not documented.
  • Dozens of open corrective actions and forward action requests remain unresolved, including duplication checks for user lists, grievance-evidence submission, and dry-season water-consumption field tests.

Credit Vintages

IssuedRetiredAvailable
2017
1,8631,8630
2018
10,00010,0000
2019
8,1578,14512
2020
4,6604,62436
2021
5,5523,1382,414
2022
5,2891,3263,963
2023
3,8832,3731,510
2024
1791763
Total39,58331,6457,938

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Energy displacement; no reversals

Leakage

0% deduction; PDD had 5%; justification thin

Baseline

Project-specific; BWBT corrected; reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents