Skip to main content
GSEnergy Efficiency - DomesticEritreaGeneral Methodologyv2.1

GS1247 VPA 179 Zoba Debub Community Boreholes

GS-1523 ↗ · current registry ID: GS7333

#524of 1329 in Industrial#21of 38 in Eritrea#822of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

The Zoba Debub Community Boreholes project (Gold Standard, Eritrea) has confirmed additionality via a combined test verified by the VVB and no reversal events, but is undermined by a significant baseline error (the original Baseline Water Boiling Test was invalidated due to kerosene use), a 0% leakage deduction that contradicts the PDD's 5% figure, and a usage-rate cap of 90% that is inconsistent with the 95% verified rate. The volume of material findings, corrective actions, and open forward action requests across multiple verification cycles signals persistent data-quality and documentation gaps that limit confidence in the 79,172 tCO₂e claim.

Red Flags

  • Original Baseline Water Boiling Test was anomalous (kerosene used to light fire), leading to an underestimated baseline; the value was corrected from 0.3 kg to 0.8892 kg and VPAs 65–70 had to be re-bundled to manage the resulting credit overage.
  • Leakage deduction is 0% in the 2024 verification report ('deemed negligible') but the PDD (2023) specified a 5% deduction — an unexplained contradiction that weakens the leakage treatment.
  • Usage rate is verified at 95% in the 2024 verification report, yet a material finding states the rate was 'capped at 90% due to BAMG changes' — the cap and the verified value are inconsistent.
  • CL#01 in the 2024 verification report flags an inconsistency in total ERs between the MR table (80,911) and the ER sheet (79,172 tCO₂e), indicating internal data-quality problems.
  • Multiple open Forward Action Requests (FAR 01–05) remain unresolved, including SDG indicator evaluation at VPA level, fNRB report submission, and justification of monitoring options.

Credit Vintages

IssuedRetiredAvailable
2017
1,8631,8630
2018
10,00010,0000
2019
8,1575,9442,213
2020
4,6604,62436
2021
5,5523,1382,414
2022
5,2771,3263,951
2023
3,8623,78577
2024
1771743
Total39,54830,8548,694

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversals

Leakage

0% deduction contradicts PDD 5%

Baseline

Project-specific, BWBT corrected

Safeguards

FPIC, grievance, benefit sharing

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents