GS1247 VPA 179 Zoba Debub Community Boreholes
GS-1523 ↗ · current registry ID: GS7333
#524of 1329 in Industrial#21of 38 in Eritrea#822of 1801 in Gold Standard (GS)
Audit Analysis
The Zoba Debub Community Boreholes project (Gold Standard, Eritrea) has confirmed additionality via a combined test verified by the VVB and no reversal events, but is undermined by a significant baseline error (the original Baseline Water Boiling Test was invalidated due to kerosene use), a 0% leakage deduction that contradicts the PDD's 5% figure, and a usage-rate cap of 90% that is inconsistent with the 95% verified rate. The volume of material findings, corrective actions, and open forward action requests across multiple verification cycles signals persistent data-quality and documentation gaps that limit confidence in the 79,172 tCO₂e claim.
Red Flags
- Original Baseline Water Boiling Test was anomalous (kerosene used to light fire), leading to an underestimated baseline; the value was corrected from 0.3 kg to 0.8892 kg and VPAs 65–70 had to be re-bundled to manage the resulting credit overage.
- Leakage deduction is 0% in the 2024 verification report ('deemed negligible') but the PDD (2023) specified a 5% deduction — an unexplained contradiction that weakens the leakage treatment.
- Usage rate is verified at 95% in the 2024 verification report, yet a material finding states the rate was 'capped at 90% due to BAMG changes' — the cap and the verified value are inconsistent.
- CL#01 in the 2024 verification report flags an inconsistency in total ERs between the MR table (80,911) and the ER sheet (79,172 tCO₂e), indicating internal data-quality problems.
- Multiple open Forward Action Requests (FAR 01–05) remain unresolved, including SDG indicator evaluation at VPA level, fNRB report submission, and justification of monitoring options.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 1,863 | 1,863 | 0 | |
| 2018 | 10,000 | 10,000 | 0 | |
| 2019 | 8,157 | 5,944 | 2,213 | |
| 2020 | 4,660 | 4,624 | 36 | |
| 2021 | 5,552 | 3,138 | 2,414 | |
| 2022 | 5,277 | 1,326 | 3,951 | |
| 2023 | 3,862 | 3,785 | 77 | |
| 2024 | 177 | 174 | 3 | |
| Total | 39,548 | 30,854 | 8,694 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversals
0% deduction contradicts PDD 5%
Project-specific, BWBT corrected
FPIC, grievance, benefit sharing
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →