5.0/ 10
Integrity
5.0
Transparency
5.5
Claim Safety
4.5
Documentation
5.0

Audit Analysis

This Gold Standard borehole project in Eritrea has a verified additionality assessment and no reversal events, but is undermined by a significant baseline test error (kerosene used in the original BWBT), a usage-rate cap contradiction (95% reported vs 90% PDD cap), and the need to re-bundle seven VPAs to manage credit overage. The project's data integrity and claim safety are materially weakened by these issues, despite otherwise reasonable leakage treatment and conservative fNRB assumptions.

Red Flags

  • Original Baseline Water Boiling Test was conducted using kerosene to light the fire, producing an anomalously low value (0.3 kg) that underestimated emission reductions; the test was redone in August 2018 yielding 0.8892 kg, and VPAs 65–70 had to be re-bundled into seven new VPAs (176–182) to manage the resulting credit overage.
  • Usage rate is reported at 95% in the 2024 verification report, but the PDD (2023) and a corrective action explicitly cap the usage rate at 90% due to BAMG changes — a 5-percentage-point discrepancy that inflates claimed reductions.
  • The monitoring period (Jan 2023 – Dec 2024) extends beyond the stated crediting period (Oct 2016 – Oct 2023), creating ambiguity about which period the 79,172 tCO2e figure covers and whether credits are being issued for periods outside the approved crediting window.
  • Extensive list of corrective actions and findings across multiple verification cycles, including unresolved items on duplication checks, grievance evidence, and sampling design, indicating persistent MRV weaknesses.

Credit Vintages

IssuedRetiredAvailable
2017
1,8631,8630
2018
10,00010,0000
2019
7,4866,630856
2020
3,8823,85230
2021
4,6262,6152,011
2022
4,3471,1063,241
2023
2,55802,558
Total34,76226,0668,696

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversal events but no permanence mechanism stated

Leakage

0% deduction deemed negligible; PDD originally proposed 5%

Baseline

Project-specific baseline; BWBT required correction; reassessed 2024

Safeguards

FPIC conducted, grievance mechanism present, benefit sharing described

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents