Vai al contenuto principale
GS Energy Efficiency - Domestic Eritrea Documentazione completa General Methodology v2.0

GS1247 VPA 182 Zoba Debub Community Boreholes

GS-1526 ↗

3.6 / 10
Integrity
4.5
Transparency
3.0
Claim Safety
3.8
Documentation
2.5

Score Breakdown

Integrity

verified Additionality confirmed by the VVB in the validation report (VVB: Earthood Services Limited).

missing Leakage not addressed and leakage deduction set to 0% despite no justification in the validation report.

Transparency

verified Monitoring period is specified (2023-01-01 — 2024-12-31) and a VVB and methodology are named (TPDDTEC, v4.0).

missing Total ERR claimed and verified not stated; evidence documents list is unknown and extraction confidence is low.

Claim Safety

verified Usage monitoring method reported (annual survey) and a verified usage rate reported (95%) in a recent document.

missing Contradictory FNRB method/value (national default 97 vs local field 0.85) and crediting period conflicts create over‑crediting risk.

Documentation

missing Min extraction confidence is low and evidence documents are listed as unknown despite 36 docs used.

missing Multiple CARs/CLs and Forward Action Requests remain relevant and a site visit is mandated in corrective actions.

Detailed Analysis

Integrity

The validation report (doc date 2025-08-18) records that a VVB confirmed additionality, which is a strong positive. However, the project uses a project-specific baseline method and leakage is noted as not addressed in the latest validation; the files show a leakage deduction of 0% without a supporting justification. Material findings include numerous corrective action requests and clarity notes related to data collection, sampling and monitoring (see validation report Appendices), which weakens confidence in baseline and monitoring assumptions.

Transparency

The project names the methodology (TPDDTEC v4.0), VVB (Earthood Services Limited) and monitoring period (2023–01–01 to 2024–12–31), which supports traceability. However, total emissions claimed and verified are not stated in the extracted record, the evidence_docs entry is 'unknown', and extraction confidence is low; these gaps mean stakeholders cannot fully verify reported outcomes from the available documents.

Claim Safety

There is a verified usage rate reported (95% in a 2024 document) and usage monitoring via annual surveys, which supports claim defensibility. Contradictions are serious: FNRB method/value conflicts (national default 97 vs local field 0.85), different usage figures across documents, and conflicting crediting periods (2013–2020 vs 2025–2030). These contradictions raise over‑crediting and double‑claiming risks and reduce claim safety.

Documentation

Although 36 documents were reportedly used and a validation report dated 2025-08-18 exists, the minimum extraction confidence is low and evidence document identifiers are missing. Multiple CARs/CLs and forward action requests (including requirements for a site visit and improved survey/sampling documentation) remain relevant; this indicates incomplete or insufficiently transparent documentary evidence.

Overall

I privileged the most recent validation report values (doc date 2025-08-18) when resolving contradictions because the validation is the highest‑level quality assurance document and is most recent. Specific contradictions addressed: (1) FNRB method: privileged 'national_default' from 2024‑07‑31 over older local_field because the validation materials indicate adoption of national defaults in updated calculations; (2) benefit sharing: privileged the 2025 validation statement that benefit sharing is described because it is the latest documentation; (3) leakage: privileged the 2025 validation note that leakage is not addressed rather than earlier 'deemed negligible' because the validation explicitly flags leakage as not justified; (4) reversal events: privileged the 2025 validation statement that reversals are not addressed over earlier 'none reported' because the validation requires explicit reversal handling; (5) FNRB value: privileged 97 from 2024 over earlier 0.85 due to the switch to national default reported in the recent documents; (6) usage_rate_verified: privileged 95 (2024) as the verified figure over older 0.9; (7) crediting period: privileged the 2025 validation period (2025–05–01 to 2030–04‑30) because it is from the latest validation; these choices reduce score where contradictions indicate reliability problems. The documentation shortfalls and persistent corrective actions materially lower confidence, resulting in the overall mid‑low score.

Audit Analysis

The project shows some positive elements (VVB-confirmed additionality, methodology and verification activity) but has multiple unresolved documentation and monitoring gaps. Key issues: leakage not addressed, contradictory inputs (fnrb, usage, crediting period), many corrective actions/CLs, and low extraction confidence. These reduce confidence in emission reductions.

Project Description

Developer: CO2balance UK ltd Type: Energy Efficiency - Domestic Size: Micro scale Methodology: GS TPDDTEC v 1. Crediting period: 2016-12-30 → 2023-12-29 Estimated annual credits: 10000 tCO2e SDGs: Goal 6: Clean Water and Sanitation, Goal 13: Climate Action, Goal 5: Gender Equality, Goal 3: Good Health and Well-Being

Red Flags

  • Leakage explicitly described as not addressed in the latest validation
  • Multiple corrective actions and clarity requests (CARs/CLs) on core monitoring data and sampling
  • Contradictory values across documents for FNRB method/value, usage rates and crediting period
  • Low extraction confidence and evidence documents not listed

Credit Vintages

Issued Retired Available
2017
1,863 1,863 0
2018
10,000 9,841 159
2019
7,266 7,266 0
2020
3,628 3,600 28
2021
4,321 2,444 1,877
2022
4,054 1,032 3,022
2023
2,903 0 2,903
Total 34,035 26,046 7,989

Cosa migliorerebbe questo punteggio

  • Publish and link all evidence documents (monitoring reports, survey forms, photos) with clear identifiers so the evidence_docs field is resolvable.
  • Provide a transparent leakage justification or quantified leakage deduction, resolve contradictions in FNRB/use rates/crediting period, and close outstanding CARs/CLs with supporting evidence (including a site visit as requested).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB confirmed

Permanence

buffer unclear

Leakage

not addressed

Baseline

project baseline

Safeguards

FPIC and grievance present

Double-claim

CORSIA/CCP status unclear

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti