Skip to main content
GSEnergy Efficiency - DomesticMozambiqueGeneral Methodologyv2.1

GS1247 VPA 199 Improved Kitchen Regimes Manica Province Safe Water (Mozambique)

GS-1845 ↗ · current registry ID: GS7471

#1061of 1329 in Industrial#34of 51 in Mozambique#1503of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.2
Documentation
3.5

Audit Analysis

This Gold Standard PoA project in Mozambique (improved kitchen regimes and safe water) has VVB-confirmed additionality and a recently reassessed baseline, but is undermined by a large discrepancy between claimed and verified ERR figures, an extensive list of open corrective actions spanning multiple verification cycles, and the absence of a stated buffer pool. The low extraction confidence and numerous unresolved documentation gaps significantly weaken confidence in the project's data integrity.

Red Flags

  • Verified ERR (57,338) is approximately 5.9× the claimed ERR (9,791) — a discrepancy that is unexplained and raises serious over-crediting or data-reliability concerns
  • Extensive list of open corrective actions (CARs and CLs) spanning multiple verification cycles, including missing survey signatures, unsubmitted databases, and unresolved SDG indicator gaps
  • Leakage deduction of 0% in the verification report contradicts a 5% figure in the PDD, and the justification shifted from 'deemed negligible' to 'quantified' between two verification reports
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable

Credit Vintages

IssuedRetiredAvailable
2019
3,5953,5950
2020
8,7298,7290
2021
5,5755,54431
2022
4,76604,766
2023
9,29709,297
2024
3,85703,857
Total35,81917,86817,951

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk unaddressed in verification

Leakage

0% deduction contradicts PDD 5%; justification inconsistent

Baseline

Project-specific baseline; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents