GS1247 VPA 20 Improved Kitchen Regimes: Gatsibo District Borehole Project, Rwanda
GS-598 ↗ · current registry ID: GS3431
#611of 1329 in Industrial#41of 139 in Rwanda#937of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard VPA project in Rwanda (improved kitchen stoves and borehole water supply) has a VVB-confirmed combined additionality test and a recently reassessed project-specific baseline, but is undermined by significant contradictions in ERR figures, leakage treatment, and fNRB values across its monitoring reports and PDD. Multiple forward action requests and corrective actions remain open, and the absence of a stated buffer pool or verified ERR figure limits confidence in the project's integrity and claim safety.
Red Flags
- ERR figures differ by a factor of four between two monitoring reports (29,460 tCO₂e in the 2021 report vs 118,202 tCO₂e in the 2020 report), with no clear explanation of scope or period differences
- Leakage deduction is stated as 0% (deemed negligible) in the 2021 monitoring report but 5% in the 2023 PDD, creating uncertainty about the actual deduction applied
- Five forward action requests (FAR 01–05) covering SDG indicators, fNRB reporting, and monitoring justification remain open at the VPA level
- fNRB value differs between the 2021 monitoring report (0.98) and the 2023 PDD (0.85), and the method is described as both 'national default' and 'local field' across documents
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 4,682 | 4,682 | 0 | |
| 2016 | 9,850 | 9,850 | 0 | |
| 2017 | 9,957 | 9,957 | 0 | |
| 2018 | 9,984 | 9,984 | 0 | |
| 2019 | 5,538 | 5,538 | 0 | |
| 2020 | 4,388 | 4,388 | 0 | |
| 2021 | 425 | 425 | 0 | |
| Total | 44,824 | 44,824 | 0 |
Risk Indicators
Combined test, VVB-confirmed
no reversals
0% vs 5% contradiction across docs
Project-specific, reassessed 2024
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →