GS1247 VPA 220 Central and Western Uganda Safe Water Project
GS-2370 ↗ · current registry ID: GS7672
#693of 1329 in Industrial#82of 163 in Uganda#1043of 1801 in Gold Standard (GS)
Audit Analysis
The Uganda Safe Water Project has VVB-verified additionality and no reversal events, but is undermined by an unusually high volume of material findings (7 CARs, 13 CLs), eleven cross-document contradictions, and a 0% leakage deduction that conflicts with the PDD's 5% figure. The project's safeguards framework (FPIC, grievance mechanism, benefit sharing) is in place, yet data-quality issues across monitoring and verification documents erode confidence in the reported emission reductions.
Red Flags
- Seven Corrective Action Requests and thirteen Clarifications were issued during verification, indicating systemic data-quality and reporting deficiencies across the monitoring cycle
- Leakage deduction is 0% in the 2025 verification report but the PDD (2025-03-21) specified a 5% deduction — the more conservative PDD value was not carried through
- Eleven contradictions across documents (usage rate, crediting period dates, fNRB method, additionality test type, benefit sharing, ERR figures) suggest inconsistent record-keeping
- Multiple boreholes reported non-functional for extended periods (e.g., NAK012 for 138 days in 2023) and water quality test failures for NAK007 and MAS038 raise operational reliability concerns
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 2,467 | 2,467 | 0 | |
| 2021 | 4,962 | 3,266 | 1,696 | |
| 2022 | 4,140 | 0 | 4,140 | |
| 2023 | 4,882 | 0 | 4,882 | |
| 2024 | 5,903 | 0 | 5,903 | |
| 2025 | 1,738 | 0 | 1,738 | |
| Total | 24,092 | 5,733 | 18,359 |
Risk Indicators
VVB-verified combined test
mixed evidence / unresolved risk
0% deduction conflicts with PDD 5%
Project-specific, reassessed 2024
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →