Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS1247 VPA 247 Kaliro Safe Water

GS-2684 ↗ · current registry ID: GS10726

#694of 1329 in Industrial#83of 163 in Uganda#1044of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

The Kaliro Safe Water project (GS10726) is a Gold Standard borehole-based safe water project in Uganda with VVB-confirmed additionality and no reported reversal events, but it is undermined by an extensive catalogue of data errors, calculation discrepancies, and borehole operational failures (23.3% water quality test failure rate) documented across multiple verification cycles. The project-specific baseline, 0% leakage deduction with a thin 'deemed negligible' justification, and numerous unresolved contradictions between monitoring and verification reports raise meaningful over-crediting and data-reliability concerns.

Red Flags

  • 23.3% of water quality tests failed (35 of 150) during the monitoring period, with 19 boreholes failing WQTs, indicating significant operational reliability issues that may not be fully reflected in the ERR calculation
  • Extensive list of material findings including formula errors, misreported usage data, incorrect WQT results, and non-functional days calculation errors across multiple verification cycles
  • Leakage deduction reduced from 5% in the PDD (2023) to 0% in the 2026 verification with only a 'deemed negligible' justification, without a quantified re-analysis
  • Multiple contradictions in ERR figures between the 2025 and 2026 verification reports (7,316 vs 19,671) that are not clearly reconciled

Credit Vintages

IssuedRetiredAvailable
2020
3,2833,2830
2021
9,9187,0612,857
2022
8,5078,000507
2023
9,25909,259
2024
7,44207,442
Total38,40918,34420,065

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% deduction, thin justification

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents