GS1247 VPA 261 Improved Kitchen Regimes Multi-Country PoA - Dowa Boreholes, Malawi
GS-2758 ↗ · current registry ID: GS10801
#449of 1329 in Industrial#44of 92 in Malawi#708of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard borehole water-supply project in Malawi with VVB-confirmed additionality and no reversal events, but undermined by a project-specific baseline, a 0% leakage deduction that contradicts the original PDD's 5% figure, numerous data-quality corrective actions, and a low extraction confidence rating. The verified ERR (68,144) sits at roughly 97% of the claimed figure for the monitoring period, suggesting modest under-delivery rather than over-crediting, yet the absence of CORSIA/CCP status and the volume of open forward-action requests leave material uncertainty about long-term claim integrity.
Red Flags
- Leakage deduction dropped from 5% in the PDD (2023) to 0% in the 2025 verification report with only a 'deemed negligible' justification — a material change that weakens the environmental integrity of the claim.
- SDG 5 impact is negative: the monitoring report records a 38.9% increase in time spent collecting water and fuel compared to baseline, indicating the project may be worsening a key social outcome for beneficiaries.
- Twelve cross-document contradictions were identified, including a 44% gap in claimed ERR between the validation report (48,807) and the verification report (70,000), raising questions about which figure is authoritative.
- Min extraction confidence is rated low, meaning at least one key document was poorly readable, reducing reliability of the extracted data.
- Five forward-action requests (FARs) from the Gold Standard review remain open, including evaluation of SDG indicators at VPA level and submission of an fNRB report, indicating unresolved compliance items.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 745 | 745 | 0 | |
| 2020 | 3,377 | 2,845 | 532 | |
| 2021 | 6,066 | 6,010 | 56 | |
| 2022 | 7,857 | 7,701 | 156 | |
| 2023 | 8,644 | 0 | 8,644 | |
| 2024 | 6,481 | 0 | 6,481 | |
| Total | 33,170 | 17,301 | 15,869 |
Risk Indicators
VVB-confirmed combined test
one borehole removed
0% deduction, contradicts PDD 5%
Project-specific, reassessed 2024
FPIC, grievance, benefit sharing present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →