GS1247 VPA 261 Improved Kitchen Regimes Multi-Country PoA - Dowa Boreholes, Malawi

GS-2758 ↗ · current registry ID: GS10801

#449of 1329 in Industrial#44of 92 in Malawi#708of 1801 in Gold Standard (GS)

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A Gold Standard borehole water-supply project in Malawi with VVB-confirmed additionality and no reversal events, but undermined by a project-specific baseline, a 0% leakage deduction that contradicts the original PDD's 5% figure, numerous data-quality corrective actions, and a low extraction confidence rating. The verified ERR (68,144) sits at roughly 97% of the claimed figure for the monitoring period, suggesting modest under-delivery rather than over-crediting, yet the absence of CORSIA/CCP status and the volume of open forward-action requests leave material uncertainty about long-term claim integrity.

Red Flags

  • Leakage deduction dropped from 5% in the PDD (2023) to 0% in the 2025 verification report with only a 'deemed negligible' justification — a material change that weakens the environmental integrity of the claim.
  • SDG 5 impact is negative: the monitoring report records a 38.9% increase in time spent collecting water and fuel compared to baseline, indicating the project may be worsening a key social outcome for beneficiaries.
  • Twelve cross-document contradictions were identified, including a 44% gap in claimed ERR between the validation report (48,807) and the verification report (70,000), raising questions about which figure is authoritative.
  • Min extraction confidence is rated low, meaning at least one key document was poorly readable, reducing reliability of the extracted data.
  • Five forward-action requests (FARs) from the Gold Standard review remain open, including evaluation of SDG indicators at VPA level and submission of an fNRB report, indicating unresolved compliance items.

Credit Vintages

IssuedRetiredAvailable
2019
7457450
2020
3,3772,845532
2021
6,0666,01056
2022
7,8577,701156
2023
8,64408,644
2024
6,48106,481
Total33,17017,30115,869

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

one borehole removed

Leakage

0% deduction, contradicts PDD 5%

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents