Skip to main content
GSEnergy Efficiency - DomesticMalawiGeneral Methodologyv2.1

GS1247 VPA 262 Improved Kitchen Regimes Multi-Country PoA - Dowa Boreholes, Malawi

GS-2759 ↗ · current registry ID: GS10802

#530of 1329 in Industrial#46of 92 in Malawi#828of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

This Gold Standard borehole project in Malawi has a VVB-verified combined additionality test and no reported reversal events, but lacks a buffer pool despite demonstrable borehole failures (water quality issues, extended outages). The 0% leakage deduction justified as 'deemed negligible' is questionable for a water-supply project where communities can revert to alternative sources, and the negative SDG 5 impact (29–39% increase in water-collection time) raises concerns about real-world project performance. Numerous data-quality corrective actions and 12 inter-document contradictions, combined with low extraction confidence, limit confidence in the overall record.

Red Flags

  • No buffer pool or permanence mechanism despite multiple boreholes failing (324-005 removed for water quality, 294-172 out of service for extended period) — energy-efficiency credits are at risk of reversal if boreholes are not maintained
  • Leakage deduction reduced from 5% in the PDD (2023) to 0% in the verification report (2025) with only a 'deemed negligible' justification, which is weak for a borehole project where households can revert to other water sources
  • SDG 5 impact is negative: 29–39% increase in time spent collecting water and firewood compared to baseline, undermining the project's co-benefit claims
  • 12 contradictions across documents, including monitoring method (annual survey vs. smart meter), leakage treatment, and crediting period dates, indicating inconsistent record-keeping
  • Low extraction confidence across the 42-document record, meaning key data may be incomplete or misread

Credit Vintages

IssuedRetiredAvailable
2019
6086080
2020
3,2213,20417
2021
6,0255,96956
2022
7,8047,649155
2023
8,8781818,697
2024
6,19106,191
Total32,72717,61115,116

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

boreholes failing

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents