GS1247 VPA 262 Improved Kitchen Regimes Multi-Country PoA - Dowa Boreholes, Malawi
GS-2759 ↗ · current registry ID: GS10802
#530of 1329 in Industrial#46of 92 in Malawi#828of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard borehole project in Malawi has a VVB-verified combined additionality test and no reported reversal events, but lacks a buffer pool despite demonstrable borehole failures (water quality issues, extended outages). The 0% leakage deduction justified as 'deemed negligible' is questionable for a water-supply project where communities can revert to alternative sources, and the negative SDG 5 impact (29–39% increase in water-collection time) raises concerns about real-world project performance. Numerous data-quality corrective actions and 12 inter-document contradictions, combined with low extraction confidence, limit confidence in the overall record.
Red Flags
- No buffer pool or permanence mechanism despite multiple boreholes failing (324-005 removed for water quality, 294-172 out of service for extended period) — energy-efficiency credits are at risk of reversal if boreholes are not maintained
- Leakage deduction reduced from 5% in the PDD (2023) to 0% in the verification report (2025) with only a 'deemed negligible' justification, which is weak for a borehole project where households can revert to other water sources
- SDG 5 impact is negative: 29–39% increase in time spent collecting water and firewood compared to baseline, undermining the project's co-benefit claims
- 12 contradictions across documents, including monitoring method (annual survey vs. smart meter), leakage treatment, and crediting period dates, indicating inconsistent record-keeping
- Low extraction confidence across the 42-document record, meaning key data may be incomplete or misread
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 608 | 608 | 0 | |
| 2020 | 3,221 | 3,204 | 17 | |
| 2021 | 6,025 | 5,969 | 56 | |
| 2022 | 7,804 | 7,649 | 155 | |
| 2023 | 8,878 | 181 | 8,697 | |
| 2024 | 6,191 | 0 | 6,191 | |
| Total | 32,727 | 17,611 | 15,116 |
Risk Indicators
Combined test, VVB-verified
boreholes failing
0% deduction, 'deemed negligible' only
Project-specific, reassessed 2024
FPIC, grievance, benefit sharing present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →