Skip to main content
GSEnergy Efficiency - DomesticMalawiGeneral Methodologyv2.1

GS1247 VPA 265 Improved Kitchen Regimes Multi-Country PoA - Dowa Boreholes, Malawi

GS-2762 ↗ · current registry ID: GS10805

#153of 1329 in Industrial#25of 92 in Malawi#278of 1801 in Gold Standard (GS)

5.7/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

A Gold Standard borehole water-supply project in Malawi with VVB-confirmed additionality and no reversal events, but weakened by a project-specific baseline, a leakage deduction that dropped from 5% in the PDD to 0% in the latest verification, and a heavy load of closed corrective actions that signal data-quality fragility. The project delivered 97.3% of its claimed emissions reductions for the monitoring period, which is reassuring, yet the low extraction confidence and twelve inter-document contradictions limit confidence in the underlying data.

Red Flags

  • Leakage deduction reduced from 5% (PDD, 2023) to 0% 'deemed negligible' (verification report, 2025) without a clearly documented re-justification in the extracted record
  • Twelve contradictions across documents, including a usage-monitoring-method conflict (annual survey vs. smart meter) within the same year, undermining data reliability
  • Minimum extraction confidence rated low, meaning at least one key document was poorly readable and key parameters may be misstated
  • Five open Forward Action Requests from the Gold Standard review (SDG indicators at VPA level, fNRB report, monitoring justification) remain unresolved
  • SDG 5 impact reported as negative: 29–38.9% increase in time spent collecting water and fuel compared to baseline, raising community-benefit concerns

Credit Vintages

IssuedRetiredAvailable
2019
1581580
2020
3,5173,49225
2021
5,4845,376108
2022
7,5744,3233,251
2023
8,1801,7636,417
2024
5,94305,943
Total30,85615,11215,744

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversals

Leakage

0% deduction, justification weakened from PDD

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents