GS1247 VPA 268 - Burkina Faso Safe Water
GS-3036 ↗ · current registry ID: GS11048
#886of 1329 in Industrial#27of 33 in Burkina Faso#1302of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard safe-water project in Burkina Faso with confirmed additionality and no reversal events, but severely undermined by an extensive list of material findings, data-quality corrections, security-driven monitoring gaps, and a project-specific baseline with a 0% leakage deduction that contradicts the original PDD. The verified ERR is below the initial claim, which is reassuring, but the sheer volume of unresolved corrective actions and open follow-up items raises significant concerns about the robustness of the underlying data.
Red Flags
- Dozens of material findings across validation, verification, and monitoring stages, including calculation errors, missing evidence, and template non-compliances that remain partially unresolved
- Security situation (terrorist attacks, displacement) has reduced water-quality testing frequency and monitoring access, with an approved deviation in place
- 8 boreholes removed from the project and 8 failed water-quality tests, indicating operational fragility
- Leakage deduction reduced from 5% in the PDD to 0% in the 2026 verification report with only a 'deemed negligible' justification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 566 | 0 | 566 | |
| 2023 | 7,390 | 0 | 7,390 | |
| 2024 | 3,558 | 0 | 3,558 | |
| Total | 11,514 | 0 | 11,514 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible', contradicts PDD's 5%
Project-specific baseline, reassessed 2025
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →