GS1247 VPA 3 Otuke District Borehole Project
GS-374 ↗ · current registry ID: GS2479
#889of 1329 in Industrial#109of 163 in Uganda#1305of 1801 in Gold Standard (GS)
Audit Analysis
The Otuke District Borehole Project (GS2479) is a Gold Standard safe-water displacement project with VVB-confirmed additionality and a recently reassessed baseline, but it is undermined by an extensive list of corrective actions, a 0% leakage deduction that contradicts the PDD's 5% figure, the absence of any buffer pool despite recurring borehole failures, and numerous data inconsistencies across documents. The project's operational track record—multiple boreholes removed from crediting for water quality and 83–86% operationality—raises material concerns about the durability of claimed reductions.
Red Flags
- Leakage deduction is 0% in the 2025 verification report, contradicting the PDD's 5% figure; the justification shifted from 'deemed negligible' to 'quantified' between documents without clear reconciliation
- Over 50 corrective actions and clarification requests are listed across verification and monitoring reports, indicating systemic data-quality and reporting deficiencies
- Reversal/permanence risk is marked as 'not addressed' in the verification report while the monitoring report states 'none reported'—an unresolved contradiction on a key integrity parameter
- Water quality tests show a 36% failure rate across boreholes, and the project has lost 5 boreholes from crediting during the project's life
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 3,500 | 3,500 | 0 | |
| 2014 | 10,000 | 10,000 | 0 | |
| 2015 | 9,342 | 9,342 | 0 | |
| 2016 | 10,000 | 10,000 | 0 | |
| 2017 | 10,000 | 10,000 | 0 | |
| 2018 | 10,000 | 10,000 | 0 | |
| 2019 | 9,126 | 9,126 | 0 | |
| 2020 | 5,270 | 5,269 | 1 | |
| 2021 | 2,253 | 64 | 2,189 | |
| 2022 | 2,126 | 2,085 | 41 | |
| 2023 | 1,961 | 1,865 | 96 | |
| 2024 | 875 | 0 | 875 | |
| Total | 74,453 | 71,251 | 3,202 |
Risk Indicators
VVB-confirmed combined test
boreholes failing
0% deduction; PDD had 5%
Project-specific; reassessed 2024
FPIC, grievance, benefit sharing
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →