Skip to main content
GSEnergy Efficiency - DomesticTogoGeneral Methodologyv2.1

GS1247 VPA 305 - Togo Safe Water

GS-3165 ↗ · current registry ID: GS11178

#1107of 1329 in Industrial#8of 15 in Togo#1558of 1801 in Gold Standard (GS)

4.1/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
3.5
Documentation
4.5

Audit Analysis

This Gold Standard VPA under a multi-country cookstove/safe-water PoA has VVB-verified additionality and a measured project-specific baseline, but is undermined by nine cross-document contradictions (including a 5× discrepancy in claimed ERR, conflicting leakage deductions, and opposing fNRB values), a large backlog of open findings and corrective actions, and the absence of any verified ERR figure against which to judge over- or under-delivery. The project's claim safety is materially weakened by the inability to reconcile the ex-ante estimates across its own documents.

Red Flags

  • Claimed ERR differs by a factor of five between two PDD versions (9,919 tCO₂e in the 2021 PDD vs 50,000 tCO₂e in the 2020 PDD), with no verified ERR available to anchor the correct figure
  • Leakage deduction is 0% in the 2023 monitoring report but 5% in the 2023 PDD; the justification shifts from 'quantified' to 'deemed negligible' across documents
  • Five open findings (FAR 01–05) require VPA-level SDG indicator evaluation, fNRB reporting, and monitoring-option applicability demonstration that remain unresolved
  • Crediting period start date conflicts: 2025-05-01 (validation report, 2025) vs 2013-05-01 (PDD, 2023), creating ambiguity about the actual crediting window

Credit Vintages

IssuedRetiredAvailable
2023
1,80301,803
2024
4,93604,936
Total6,73906,739

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% vs 5% contradiction across docs

Baseline

Project-specific, measured, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents