Skip to main content
GSEnergy Efficiency - DomesticTogoGeneral Methodologyv2.1

GS1247 VPA 307 - Togo Safe Water

GS-3167 ↗ · current registry ID: GS11180

#1182of 1329 in Industrial#10of 15 in Togo#1640of 1801 in Gold Standard (GS)

3.9/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
4.0
Documentation
3.5

Audit Analysis

The Togo Safe Water project (VPA 307, part of a 5-VPA verification) has VVB-confirmed additionality and no reversal events, but is burdened by an extraordinary volume of material findings, 60+ corrective actions, 5 open forward action requests, and 9 inter-document contradictions. ER calculation errors, a contradictory leakage treatment (0% 'quantified' vs 5% in the PDD vs 'deemed negligible' in the monitoring report), and a low extraction confidence level collectively undermine confidence in the integrity and reliability of the verified figures.

Red Flags

  • 60+ corrective actions and 5 open FARs remain unresolved, indicating persistent compliance and documentation gaps
  • ER calculation errors in Parameters Cj and Xboil required correction, undermining confidence in the verified 16,591 tCO₂e figure
  • Leakage treatment is contradictory across documents: 0% 'quantified' in the verification report, 5% in the PDD, and 'deemed negligible' in the monitoring report
  • 9 contradictions between documents, including a 67% discrepancy in ERR figures (9,919 in the PDD vs 16,591 in the verification report) that may reflect different VPA scopes but is unclarified
  • Baseline calculation error: Qp,y was capped at 7.5 litres/person/day instead of the correct 7, requiring correction

Credit Vintages

IssuedRetiredAvailable
2022
1,45601,456
2023
6,64706,647
2024
3,91703,917
Total12,020012,020

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversal events but no permanence claim

Leakage

0% deduction with contradictory justifications across 3 documents

Baseline

Project-specific baseline; calculation error in Qp,y; reassessed 2024

Safeguards

FPIC, grievance mechanism, and benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents