Skip to main content
GSEnergy Efficiency - DomesticTogoGeneral Methodologyv2.1

GS1247 VPA 309 - Togo Safe Water

GS-3169 ↗ · current registry ID: GS11182

#1283of 1329 in Industrial#14of 15 in Togo#1750of 1801 in Gold Standard (GS)

3.2/ 10
Integrity
3.5
Transparency
3.0
Claim Safety
3.5
Documentation
2.5

Audit Analysis

This Gold Standard safe-water project in Togo has a VVB-confirmed additionality assessment and no reversal events, but is severely undermined by an extraordinary volume of material findings (over 50), corrective actions (over 60), and nine cross-document contradictions affecting key parameters such as leakage, fNRB, usage rate, and crediting period. The low extraction confidence and numerous open forward action requests indicate that the project's monitoring and reporting quality is well below the standard expected for verified carbon credits.

Red Flags

  • Over 50 material findings and 60+ corrective actions identified in the verification report, including errors in ER calculation parameters (Cj, Xboil) that directly affect credit quantities
  • Nine contradictions across documents on key parameters: leakage deduction (0% vs 5%), fNRB (0.87 vs 0.97), usage rate (0.9 vs 15), crediting period (2022–2028 vs 2025–2030), and additionality test type
  • Water quality failures (nitrates, nitrites, coliforms) caused non-functioning days at the start of the monitoring period, and monitoring surveys were delayed beyond 12 months
  • Multiple forward action requests (FAR 01–05) remain open, including VPA-level SDG indicator evaluation and fNRB reporting
  • Low extraction confidence indicates at least one key document was poorly readable, reducing reliability of the extracted data

Credit Vintages

IssuedRetiredAvailable
2022
2470247
2023
6,90306,903
2024
4,16604,166
Total11,316011,316

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% deduction contradicted by PDD 5%

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance, benefit sharing present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents