Skip to main content
GSEnergy Efficiency - DomesticEritreaGeneral Methodologyv2.1

GS1247 VPA 47 Eritrean District Boreholes

GS-1506 ↗ · current registry ID: GS4518

#1062of 1329 in Industrial#36of 38 in Eritrea#1504of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
3.5
Documentation
4.5

Audit Analysis

This Gold Standard borehole project in Eritrea has VVB-confirmed additionality and no reported reversals, but is undermined by ten cross-document contradictions, an exact match between claimed and verified emission reductions (37,380 tCO₂e), and a 0% leakage deduction whose justification conflicts with the PDD's 5% figure. The project-specific baseline, absence of a buffer pool, and the sheer volume of material findings and corrective actions raise significant concerns about the robustness of the credit claims.

Red Flags

  • Claimed and verified emission reductions are identical (37,380 tCO₂e) across two separate verification reports (Jan 2023 and Sep 2023), suggesting the VVB did not independently recalculate the figure
  • Leakage deduction is 0% in the 2023 monitoring report with a 'deemed negligible' justification, but the PDD (Jun 2023) specifies a 5% deduction and the 2022 monitoring report describes leakage as 'quantified' — three documents, three different treatments
  • fNRB value is 0.97 in the 2023 monitoring report but 0.85 in the PDD; the higher value favours the project and the method also shifts from 'local field' (2013 validation) to 'national default' (2023 MR)
  • Crediting period is stated as 2015–2022 in the monitoring report but 2025–2030 in the 2025 validation report, making it impossible to determine the correct pro-rata expectation for the 2023–2024 monitoring period

Credit Vintages

IssuedRetiredAvailable
2015
66660
2016
10,00010,0000
2017
10,00010,0000
2018
8498490
2019
9,1519,1510
2020
6,2546,2540
2021
6,8353,0963,739
2022
8,5713,7294,842
Total51,72643,1458,581

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals yet

Leakage

0% deduction contradicted by PDD's 5%

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents