GS1247 VPA 55 Eritrean District Boreholes
GS-865 ↗ · current registry ID: GS4798
#451of 1329 in Industrial#15of 38 in Eritrea#710of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard borehole rehabilitation project in Eritrea has VVB-verified additionality and no reversal events, but is undermined by 12 cross-document contradictions, a potential double-counting of boreholes flagged in material findings, a leakage deduction that was reduced from 5% to 0% without clear justification, and a 16% gap between claimed and verified emission reductions. The low extraction confidence and numerous open corrective actions further erode confidence in the data integrity.
Red Flags
- Material finding CL#1 identifies potential double counting of boreholes ZMA 054/055 and ZMA 056/057 due to identical GPS coordinates, which could inflate emission reductions
- Leakage deduction was reduced from 5% in the PDD to 0% in the 2023 monitoring report, with the justification shifting from 'quantified' to 'deemed negligible' — a weakening of conservatism without documented re-analysis
- 12 contradictions across documents, including conflicting FNRB values (0.97 national default vs 0.85 local field), conflicting FPIC status (false in monitoring report vs true in validation report), and conflicting crediting periods (2015–2022 vs 2025–2030)
- Total ERR claimed (39,367 tCO2) exceeds total ERR verified (33,064 tCO2) by approximately 16%, and no lifetime ex-ante estimate is available to contextualise the figures
- Low extraction confidence across the document set, with one document of unknown type, reducing reliability of the extracted data
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 9 | 9 | 0 | |
| 2016 | 10,000 | 10,000 | 0 | |
| 2017 | 10,000 | 10,000 | 0 | |
| 2018 | 849 | 849 | 0 | |
| 2019 | 9,151 | 9,151 | 0 | |
| 2020 | 6,143 | 6,143 | 0 | |
| 2021 | 6,825 | 3,092 | 3,733 | |
| 2022 | 8,762 | 3,872 | 4,890 | |
| Total | 51,739 | 43,116 | 8,623 |
Risk Indicators
VVB-confirmed combined test
pump breakdowns documented
0% deduction; justification weakened from 5% to negligible
Project-specific; reassessed 2024
Grievance mechanism present; FPIC status contradictory
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →