Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS1247 VPA 60 Improved Kitchen Regimes: Kayonza District Borehole Project, Rwanda

GS-867 ↗ · current registry ID: GS4901

#832of 1329 in Industrial#64of 139 in Rwanda#1231of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
4.0
Documentation
4.5

Audit Analysis

This Gold Standard improved-cookstove project in Rwanda has a confirmed investment-test additionality and no reported reversal events, but is undermined by twelve cross-document contradictions—including a four-fold discrepancy in claimed emissions reductions between two monitoring reports—and the absence of a buffer pool. The project-specific baseline and unresolved leakage-justification conflict (0% vs 5%) further weaken the integrity and claim-safety profile. Ten open corrective actions and several outstanding findings indicate the documentation is still maturing.

Red Flags

  • Claimed ERR of 38,968 tCO₂e (2021 monitoring report) versus 159,041 tCO₂e (2020 monitoring report) — a 4× discrepancy with no explanation in the extracted record
  • Leakage treatment contradicted: 0% deduction (2021 monitoring report) vs 5% deduction (2023 PDD); the more recent PDD value of 5% is privileged but the inconsistency signals weak leakage analysis
  • Ten corrective actions remain open, including requests to elaborate the leakage analysis, submit baseline survey results, and provide a detailed monitoring plan with carbon parameters
  • fNRB value and method are contradicted across documents (0.98 national default vs 0.85 local field), creating uncertainty about the true non-repudiation baseline

Credit Vintages

IssuedRetiredAvailable
2015
56560
2016
10,00010,0000
2017
10,00010,0000
2018
10,00010,0000
2019
8,3317,817514
2020
2,5682,5680
Total40,95540,441514

Risk Indicators

Additionality

VVB-confirmed investment test (2025)

Permanence

no reversals reported

Leakage

Contradicted: 0% vs 5%; 5% privileged (2023 PDD)

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents