Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS1247 VPA 61 Improved Kitchen Regimes: Kayonza District Borehole Project, Rwanda

GS-884 ↗ · current registry ID: GS5033

#1065of 1329 in Industrial#98of 139 in Rwanda#1507of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
5.0
Transparency
3.5
Claim Safety
3.5
Documentation
5.0

Audit Analysis

This Gold Standard cookstove project in Rwanda has VVB-confirmed additionality and no reported reversals, but suffers from a severe 4× discrepancy in claimed emission reductions between two monitoring reports, a complete absence of a verified ERR figure, and contradictory leakage and fNRB values across documents. Thirteen inter-document contradictions and ten open corrective actions significantly undermine confidence in the project's quantified claims.

Red Flags

  • Claimed ERR of 38,968 tCO₂e (2021 monitoring report) contradicts 159,041 tCO₂e (2020 monitoring report) — a 4× discrepancy with no verified figure to adjudicate
  • No verified ERR figure exists in any available document, making it impossible to confirm or reject the claimed reductions
  • Leakage treatment is contradictory: the 2021 monitoring report applies a 0% deduction and deems leakage negligible, while the 2023 PDD quantifies a 5% deduction
  • Five Forward Action Requests (FARs) remain open, including the requirement for a VPA-level fNRB report and SDG indicator substantiation

Credit Vintages

IssuedRetiredAvailable
2016
3,7263,7260
2017
10,00010,0000
2018
10,00010,0000
2019
8,3317,996335
2020
2,5682,5680
Total34,62534,290335

Risk Indicators

Additionality

VVB-confirmed combined test (2025)

Permanence

no reversals reported

Leakage

Contradictory: 0% vs 5% deduction

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents