GS1247 VPA 63 Improved Kitchen Regimes: Kayonza District Borehole Project, Rwanda
Score Breakdown
Integrity
verified The monitoring report states a quantified leakage treatment and says the breakdown period for borehole KAY039 was deducted from crediting.
missing Additionality test type is not stated in available documents, and VVB confirmation of additionality is not found in the extracted record.
Transparency
verified The monitoring report provides a defined monitoring period and a specific usage monitoring method based on annual surveys.
missing Total claimed versus verified emission reductions are not stated, and the VVB name is not found in the extracted record.
Claim Safety
verified The monitoring report shows a quantified leakage approach rather than leaving leakage entirely unaddressed.
missing The baseline is project-specific rather than clearly standardized or recently reassessed, and the record contains contradictions on usage rate and leakage justification.
Documentation
verified Two document types were used, and the extraction confidence is high.
missing The extracted record does not identify the VVB, and the crediting period differs across monitoring documents, indicating documentation inconsistency.
Detailed Analysis
Integrity
The monitoring report indicates a project baseline and a quantified leakage treatment, which supports some methodological discipline. At the same time, additionality test type is not stated and additionality is not confirmed by the VVB in the extracted record, which weakens the integrity assessment. The report also notes a temporary breakdown of borehole KAY039 in 2017 and says those dates were deducted from crediting, but reversal risk is otherwise not clearly managed and no buffer pool is shown.
Transparency
The monitoring report gives a clear monitoring period and says usage was monitored through annual surveys, which helps traceability. However, total claimed and verified emission reductions are not stated, and the VVB name is not found in the extracted record. The absence of registry-level completeness details limits confidence in public-facing transparency.
Claim Safety
Claim safety is supported somewhat by the quantified leakage treatment and the fact that the monitoring report documents a deduction for the temporary borehole breakdown. But the baseline is project-specific, the usage rate is inconsistent across documents, and the leakage justification is contradicted by the PDD, which weakens confidence in the claimed climate benefit. CORSIA eligibility is not stated and CCP status is only noted as not mentioned, so dual-claim risk is not fully resolved.
Documentation
The record draws on a PDD and monitoring report, and the extraction confidence is high, which is a positive sign. Even so, the VVB name is missing, and the crediting period differs between monitoring documents, suggesting incomplete or inconsistent documentation. No material findings or corrective actions were reported, which is positive, but the overall documentary package still has notable gaps.
Overall
I privileged the more recent monitoring report from 2021 over earlier documents where the extracted record showed contradictions, because it is the latest available source and includes updated monitoring results. Specifically, I relied on the 90% verified usage rate and the quantified leakage treatment from the 2021 monitoring report, while noting that the PDD and earlier monitoring report conflict on usage rate, leakage handling, reversal reporting, and crediting period. Those contradictions reduce reliability and justify a cautious overall score.
Audit Analysis
This project has some positive MRV features, including a quantified leakage treatment, a grievance mechanism, FPIC, and no material findings reported in the monitoring report. However, key robustness elements are weak or missing in the extracted record, especially additionality verification, VVB identification, and a clear treatment of reversal risk beyond a temporary borehole breakdown that was deducted from crediting.
Project Description
Developer: CO2balance UK ltd Type: Energy Efficiency - Domestic Size: Micro Scale Methodology: GS TPDDTEC v 1. Crediting period: 2016-08-19 → 2023-08-19 Estimated annual credits: 10000 tCO2e SDGs: Goal 5: Gender Equality, Goal 6: Clean Water and Sanitation, Goal 3: Good Health and Well-Being, Goal 13: Climate Action
Red Flags
- Additionality is not confirmed by the VVB in the extracted record, and the specific test type is not stated.
- The monitoring report notes a temporary borehole breakdown in 2017, but reversal risk is otherwise not clearly addressed and no buffer pool is shown.
- There are contradictions across documents on usage rate, leakage treatment, reversal reporting, and crediting period, which reduces reliability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 3,699 | 3,699 | 0 | |
| 2017 | 10,000 | 10,000 | 0 | |
| 2018 | 10,000 | 10,000 | 0 | |
| 2019 | 8,401 | 7,559 | 842 | |
| 2020 | 2,640 | 2,640 | 0 | |
| Total | 34,740 | 33,898 | 842 |
Cosa migliorerebbe questo punteggio
- Provide explicit VVB confirmation of additionality, including the test type and supporting evidence.
- Publish a reconciled monitoring package that resolves the contradictions on usage rate, leakage treatment, reversal reporting, and crediting period, and clearly states claimed versus verified emission reductions.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
additionality not independently confirmed
temporary breakdown deducted, but reversal risk not fully ad
quantified leakage treatment
project baseline, reassessment timing unclear
FPIC, grievance mechanism, and benefit sharing documented
CORSIA eligibility not stated; CCP status not mentioned
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →