Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS1247 VPA 64 Improved Kitchen Regimes: Kayonza District Borehole Project, Rwanda

GS-887 ↗ · current registry ID: GS5036

#1108of 1329 in Industrial#105of 139 in Rwanda#1559of 1801 in Gold Standard (GS)

4.1/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
3.5
Documentation
3.5

Audit Analysis

This Gold Standard VPA sub-project (Kayonza District Borehole, Rwanda) has VVB-confirmed additionality and no reported reversal events, but is undermined by eleven cross-document contradictions in core parameters (fNRB, leakage, ERR, crediting period), five open findings requiring action, and the absence of a stated buffer pool. The volume of inconsistencies across the PDD, validation report, and monitoring reports significantly erodes confidence in the reliability of the claimed emission reductions.

Red Flags

  • Eleven contradictions across documents in fundamental parameters including fNRB (0.98 vs 0.85), leakage deduction (0% vs 5%), claimed ERR (38,968 vs 159,041), and crediting period (2015–2022 vs 2025–2030)
  • Five open findings requiring action (FAR 01–05) covering SDG indicators, fNRB reporting, and monitoring justification remain unresolved
  • Leakage deduction of 0% justified as 'deemed negligible' in the 2021 monitoring report, but the 2023 PDD specifies a 5% deduction — the more conservative figure was not applied
  • Boreholes KAY001, KAY004, KAY011, KAY013-5, KAY017, KAY022, KAY026, KAY027, KAY030, KAY031, and KAY039 all experienced temporary breakdowns in 2017, indicating operational fragility

Credit Vintages

IssuedRetiredAvailable
2016
3,7813,7810
2017
10,00010,0000
2018
10,00010,0000
2019
8,5458,396149
2020
3,2103,2100
Total35,53635,387149

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% applied vs 5% in PDD; contradictory

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents