GS1247 VPA 65 Zoba Debub Community Boreholes
Score Breakdown
Integrity
verified Additionality confirmed by the VVB (verification/validation report, 2025-08-18).
missing Leakage not addressed in the latest document and no buffer pool percentage stated, with reversal events likewise not addressed (verification report, 2025-08-18).
Transparency
verified VVB named (Earthood Services Limited) and monitoring period provided (2023–2024) in verification materials.
missing Key figures missing from extracted records: total emission reductions claimed and verified are not stated; evidence documents are listed as unknown and extraction confidence is low.
Claim Safety
missing Large contradiction in baseline/free-rider inputs: a recent value of 97 (2024) vs prior 0.85 (2023) which risks over-crediting if the higher value is used.
inferred Usage monitoring is reported as annual survey (2024) and the verified usage rate is 95% vs assumed 90% — monitoring may support the usage assumption but some inconsistency in methods across docs.
Documentation
verified Many documents used (n = 31) and a recent validation/verification report dated 2025-08-18 is present.
missing Minimum extraction confidence is low and the evidence_docs list is 'unknown', reducing confidence in the extracted record; several forward action requests remain open.
Detailed Analysis
Integrity
Additionality is confirmed by the VVB (validation/verification report, 2025-08-18), and the baseline was reassessed in 2024, which supports baseline validity. However, leakage is noted as not addressed in the latest document and the project reports a 0% leakage deduction despite earlier documents deeming leakage negligible; reversal events are not addressed and no buffer pool percentage is provided. Several corrective actions and closed/raised findings are recorded (CARs/CLs in the verification report), which indicates issues were found and mostly closed but forward action requests remain.
Transparency
The VVB is named and the monitoring period is provided (2023–2024), and safeguards such as FPIC and a grievance mechanism are documented. Critical transparency failures include missing total emission reductions claimed and verified in the extracted record, and the evidence document list is unknown. The minimum extraction confidence is low, indicating at least one key document was poorly readable, which lowers our trust in the completeness of disclosed data.
Claim Safety
There is a substantial contradiction in the free-rider / non-project baseline value (97 versus 0.85 across documents), and the method for FN/RB is reported alternately as national default and local field — we privilege the more recent values (national default and 97, dated 2024) because they are later, but this raises over-crediting risk if the change is not justified. Leakage being marked as not addressed in the latest report further increases claim-risk. Usage monitoring appears to be annual survey in the later documents and verified usage (95%) is close to the assumed rate (90%), which mitigates some risk but does not offset the other contradictions.
Documentation
There are many documents used (31) and a recent validation report (2025-08-18) is present, which is positive. However, the evidence_docs entry is 'unknown' and the minimum extraction confidence is low, signalling poor extractability/readability of at least one key source. Several forward action requests remain open (duplication check evidence, grievance evidence, timing of field tests), which reduces documentation completeness and reliability.
Overall
I privileged the more recent document values when contradictions existed (e.g., national-default FN/RB and value 97 dated 2024 over earlier local-field 0.85 dated 2023; benefit sharing described = true in 2025 over false in 2024; leakage 'not addressed' in 2025 over 'deemed negligible' in 2024). The 2025 validation report and 2024 reassessments are treated as higher priority because they are more recent and likely reflect project updates. These privilegings reduce confidence because later documents often introduce unresolved gaps (leakage not addressed, reversal not addressed) or large swings in key parameters. Given VVB confirmation of additionality and closed findings, integrity is moderate, but missing ERR figures, low extraction confidence, and contradictory FN/RB baseline inputs drive down transparency and claim safety, producing an overall score of 4.4.
Audit Analysis
Project shows some positive elements (VVB confirmation of additionality, recent baseline reassessment, FPIC and grievance mechanism) but has important gaps and contradictions (leakage not addressed, missing ERR figures, divergent FN/RB values). Data extraction confidence is low and several forward action requests remain, reducing confidence in credits.
Project Description
Developer: CO2balance UK ltd Type: Energy Efficiency - Domestic Size: Micro scale Methodology: GS TPDDTEC v 1. Crediting period: 2016-10-21 → 2023-10-20 Estimated annual credits: 10000 tCO2e SDGs: Goal 13: Climate Action, Goal 6: Clean Water and Sanitation, Goal 5: Gender Equality, Goal 3: Good Health and Well-Being
Red Flags
- Leakage is stated as not addressed in the most recent document while a prior document deemed it negligible.
- Big contradiction in free-rider / non-project baseline value (97 vs 0.85) indicating potential data/extraction or methodology inconsistency.
- Total emission reduction/ERR claimed and verified are not found in the extracted record.
Credit Vintages
Nessuna emissione registrata sul registro.
Il marketplace dichiara i vintage: 2022, 2023 (non verificato).
Cosa migliorerebbe questo punteggio
- Publish the missing emission reduction claims and verification figures in accessible documents and resolve extraction/readability issues.
- Provide a clear justification for the FN/RB methodological change and the large FN/RB value change, and explicitly document leakage analysis or apply a quantified leakage deduction.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed
reversal risk unaddressed
not addressed
project baseline, recent reassessment
FPIC & grievance present
CORSIA/CCP status unclear
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- GS5038-43 5825-27 7330-36_Debub BHs Annual-Report 2022(15).pdf
- PoA GS1247 Annual-Report - signed.pdf
- ZD MP6_MP5 MR v5_CLEAN(7).pdf
- Monitoring Report_3rd monitoring period_01.06.2019 to 31.05.2020.v3.pdf
- (1)Monitoring Report_1st monitoring period_20.10.2016 to 19.10.2017_v1.pdf
- (2)Monitoring Report_2nd monitoring period_20.10.2017 to 31.05.2019_v5.pdf
- +3 more
pdd
validation
- CO2b User Numbers Deviation-Request-Form v1_Final decision.pdf
- GS.VER.23.99_FVR_CF(7).pdf
- GS1247_PoA-DD Clean_CP2_Improved Kitchen_19-02-2025.pdf
- GS1247_Internal_Validation_PoA_13062013_final.pdf
- DEV_255 (1).pdf
- GS_5038_Eritrea_Boreholes_VPA65_Local_Stakeholder_Consultation_Report_V1.1_CLEAN.pdf
- +6 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →