Skip to main content
GSEnergy Efficiency - DomesticEritreaGeneral Methodologyv2.1

GS1247 VPA 84 Zoba Maekel Community Boreholes

GS-1508 ↗ · current registry ID: GS5244

#1012of 1329 in Industrial#33of 38 in Eritrea#1445of 1801 in Gold Standard (GS)

4.3/ 10
Integrity
4.2
Transparency
5.0
Claim Safety
4.0
Documentation
4.0

Audit Analysis

This Gold Standard community borehole project in Eritrea has a VVB-confirmed additionality assessment and no reported reversal events, but is undermined by 11 cross-document contradictions, a material finding of double-counting boreholes and users, a 0% leakage deduction justified only as 'deemed negligible' (contradicting the PDD's 5% figure), and 14 outstanding corrective actions. The significant gap between claimed (39,380) and verified (14,348) emission reductions, combined with the absence of a buffer pool and unclear CORSIA/CCP status, limits confidence in the credit's integrity and claim safety.

Red Flags

  • Double counting of boreholes and users in close proximity was identified in the verification report and resolved only through GPS updates and duplicate removal, indicating weak initial MRV controls.
  • Eleven contradictions across documents, including a shift in leakage justification from 'quantified' (2020 monitoring) to 'deemed negligible' (2023 monitoring) and a change in fNRB from 0.85 (PDD) to 0.97 (monitoring report), raise data-reliability concerns.
  • Claimed ERR of 39,380 versus verified ERR of 14,348 represents a 63.6% shortfall if both refer to the same monitoring period, or a 127% over-delivery on a pro-rata basis (2-year monitoring / 7-year crediting period); the ambiguity itself is a red flag.
  • Fourteen corrective actions remain, including the need to elaborate the leakage analysis in a detailed manner and to submit baseline survey and field-test results.

Credit Vintages

IssuedRetiredAvailable
2016
9,2899,2890
2017
10,00010,0000
2018
8838830
2019
9,1179,1170
2020
6,4636,42439
2021
6,8513,3873,464
2022
9,0382578,781
2023
3460346
Total51,98739,35712,630

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, reassessed 2024

Safeguards

Grievance & benefit sharing present; FPIC contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents