Skip to main content
GSEnergy Efficiency - DomesticMalawiGeneral Methodologyv2.1

GS1265 - African Biomass Energy Conservation POA - Malawi Biomass Conservation - Dowa District

GS-196 ↗ · current registry ID: GS1330

#1013of 1329 in Industrial#70of 92 in Malawi#1446of 1801 in Gold Standard (GS)

4.3/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.0
Documentation
4.0

Audit Analysis

This Gold Standard cookstove POA in Malawi has a VVB-verified additionality test and a quantified 21.88% leakage deduction, but is undermined by an extraordinary volume of corrective actions (24 items), seven material findings, and contradictions across nearly every key parameter including leakage, FNRB, ERR figures, and FPIC status. The 100% usage-rate assumption, unverified usage rate, and the fact that verified ERRs exceed the lifetime ex-ante estimate raise meaningful over-crediting concerns. The project's data reliability is further weakened by a four-year gap between the monitoring period (2017–2019) and the verification report (2023).

Red Flags

  • 24 corrective actions across verification cycles, including 'Correct ER calculations to ensure compliance with 180 GWh thermal limit' and 'Resolve discrepancies in usage rates and efficiency values', indicating persistent calculation and data-quality problems
  • Verified ERRs (387,394) exceed the lifetime ex-ante estimate (329,223), suggesting potential over-crediting even before accounting for the POA multi-VPA structure
  • FPIC status is contradictory: the most recent validation report (September 2024) states FPIC was not conducted, while an earlier one (June 2024) states it was
  • Usage rate assumed at 100% with no verified usage-rate figure found in any document, and a corrective action requiring an additional 10% conservativeness correction factor
  • FNRB value contradicts between 0.81 (verification report, 2018) and 0.3 (PDD, 2023) — a 2.7× discrepancy that materially affects emission-reduction calculations

Credit Vintages

IssuedRetiredAvailable
2012
3,7023,578124
2013
52,4539,44443,009
2014
80,78751,61529,172
2015
80,78771,5269,261
2016
47,83547,8350
2017
23,65821,4702,188
2018
6,7346,7340
2019
1,9451,90738
Total297,901214,10983,792

Risk Indicators

Additionality

VVB-verified combined test

Permanence

mixed evidence / unresolved risk

Leakage

Quantified but contradictory (21.88% vs 10%)

Baseline

Project-specific, not yet reassessed

Safeguards

FPIC not conducted; grievance mechanism present but contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents