GS1265 - African Biomass Energy Conservation POA - Malawi Biomass Conservation - Dowa District
GS-196 ↗ · current registry ID: GS1330
#1013of 1329 in Industrial#70of 92 in Malawi#1446of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove POA in Malawi has a VVB-verified additionality test and a quantified 21.88% leakage deduction, but is undermined by an extraordinary volume of corrective actions (24 items), seven material findings, and contradictions across nearly every key parameter including leakage, FNRB, ERR figures, and FPIC status. The 100% usage-rate assumption, unverified usage rate, and the fact that verified ERRs exceed the lifetime ex-ante estimate raise meaningful over-crediting concerns. The project's data reliability is further weakened by a four-year gap between the monitoring period (2017–2019) and the verification report (2023).
Red Flags
- 24 corrective actions across verification cycles, including 'Correct ER calculations to ensure compliance with 180 GWh thermal limit' and 'Resolve discrepancies in usage rates and efficiency values', indicating persistent calculation and data-quality problems
- Verified ERRs (387,394) exceed the lifetime ex-ante estimate (329,223), suggesting potential over-crediting even before accounting for the POA multi-VPA structure
- FPIC status is contradictory: the most recent validation report (September 2024) states FPIC was not conducted, while an earlier one (June 2024) states it was
- Usage rate assumed at 100% with no verified usage-rate figure found in any document, and a corrective action requiring an additional 10% conservativeness correction factor
- FNRB value contradicts between 0.81 (verification report, 2018) and 0.3 (PDD, 2023) — a 2.7× discrepancy that materially affects emission-reduction calculations
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 3,702 | 3,578 | 124 | |
| 2013 | 52,453 | 9,444 | 43,009 | |
| 2014 | 80,787 | 51,615 | 29,172 | |
| 2015 | 80,787 | 71,526 | 9,261 | |
| 2016 | 47,835 | 47,835 | 0 | |
| 2017 | 23,658 | 21,470 | 2,188 | |
| 2018 | 6,734 | 6,734 | 0 | |
| 2019 | 1,945 | 1,907 | 38 | |
| Total | 297,901 | 214,109 | 83,792 |
Risk Indicators
VVB-verified combined test
mixed evidence / unresolved risk
Quantified but contradictory (21.88% vs 10%)
Project-specific, not yet reassessed
FPIC not conducted; grievance mechanism present but contradictory
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →