GS1340 Efficient cookstoves in Burkina Faso - VPA-01 - tiipaalga F3PA cookstoves in Bam and Loroum
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB in the verification report, and the report states no material findings.
missing The additionality test type is not stated, the baseline reassessment timing is missing, and reversal handling is not addressed clearly.
Transparency
verified The monitoring report covers a defined period from 2023-01-01 to 2023-12-31, and the verification report names Earthood Services Limited as the VVB.
missing Verified and claimed ERR totals are not stated, and low extraction confidence reduces trust in the completeness of the record.
Claim Safety
verified Leakage is quantified at 5%, and the verified usage rate is very close to the assumed 95% level.
missing The project is marked CORSIA-eligible while CCP status is not mentioned, and several contradictions raise over-crediting and dual-claim concerns.
Documentation
verified Twenty-seven documents were used, and the verification report is dated 2026-02-11, which is relatively recent.
missing Extraction confidence is low, evidence documents are not identified clearly, and several core fields are missing or only partially specified.
Detailed Analysis
Integrity
The verification report confirms additionality was checked by the VVB, and it reports no material findings or corrective actions required. Leakage is treated with a quantified 5% deduction, which is a positive sign, but the additionality test type is not stated and the baseline was set as project-based without a reassessment date. Reversal handling is also weakly documented because reversal events are marked as not addressed in the extracted record.
Transparency
The monitoring period is clearly stated as 2023-01-01 to 2023-12-31, and the VVB is identified as Earthood Services Limited. Still, the record does not state verified or claimed ERR totals, and the low extraction confidence suggests at least one key source was difficult to read. That combination limits confidence in the completeness of the public-facing MRV trail.
Claim Safety
The project uses a quantified leakage deduction of 5%, and the verified usage rate is essentially the same as the assumed 95%, which reduces concern about usage overstatement. On the other hand, the project is marked CORSIA-eligible while CCP status is not mentioned, so dual-channel claim risk is not fully resolved. The contradictions around leakage, usage monitoring, and FNRB also weaken confidence in the claim quality.
Documentation
The record indicates 27 documents were used, and the verification report date is 2026-02-11, which supports some recency. However, extraction confidence is low, and the evidence document list is not actually identified beyond an unspecified entry. Important fields such as the additionality test type, baseline reassessment date, and verified ERR totals are missing, so the documentation package is incomplete.
Overall
I privileged the newer verification report for the 5% leakage deduction, annual survey usage monitoring, and the statement that no material findings were reported, because it is the most recent and specific source in the extracted record. I also note the contradictions explicitly: leakage deduction differs from an earlier 0.95 figure, usage monitoring shifts from self-report to annual survey, reversal status changes from none reported to not addressed, FNRB changes sharply, and the crediting period differs across documents; these inconsistencies reduce reliability and pull scores down. Because documentation quality is only moderate and integrity is above the gate threshold, the overall score remains mid-range rather than high.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality, a quantified leakage deduction, and no material findings reported in the verification report. However, reliability is weakened by low extraction confidence, missing key details such as the additionality test type and baseline reassessment timing, and several contradictions across documents. Overall, this looks like a moderately documented cookstove project with meaningful but not severe evidence gaps.
Project Description
Developer: Tiipaalga Type: Energy Efficiency - Domestic Size: Micro Scale Crediting period: 2015-02-05 → 2025-02-04 Estimated annual credits: 8818 tCO2e SDGs: Goal 13: Climate Action, Goal 1: No Poverty, Goal 4: Quality Education, Goal 3: Good Health and Well-Being, Goal 7: Affordable and Clean Energy, Goal 5: Gender Equality
Red Flags
- The record contains multiple contradictions, including leakage deduction, usage monitoring method, reversal status, FNRB value, and crediting period.
- Key items are not stated in the available documents, including the additionality test type, baseline reassessment date, and verified ERR totals.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 2,292 | 2,292 | 0 | |
| 2016 | 6,582 | 5,665 | 917 | |
| 2017 | 9,894 | 285 | 9,609 | |
| 2018 | 9,485 | 9,485 | 0 | |
| 2019 | 8,138 | 3,983 | 4,155 | |
| 2020 | 9,991 | 0 | 9,991 | |
| 2021 | 5,656 | 1,607 | 4,049 | |
| 2022 | 4,280 | 552 | 3,728 | |
| Total | 56,318 | 23,869 | 32,449 |
Cosa migliorerebbe questo punteggio
- Provide a clean, reconciled document set that resolves the contradictions on leakage, usage monitoring, reversal status, FNRB, and crediting period.
- Publish the missing core MRV details, especially the additionality test type, baseline reassessment history, and verified ERR totals.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed but test type not stated
reversal handling not clearly addressed
quantified 5% deduction
project baseline without reassessment date
FPIC and grievance mechanism documented
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Monitoring Report_1st monitoring period_05-02-2015 to 31-12-2015_v2.pdf
- Annual_Report_Bam_Loroum_2025.pdf
- T-PerfCert_V1.1- MR_GS1340_GS2456_GS3516-GS3524_MP8_v4(10).pdf
- (1)Monitoring Report_4th monitoring period_01-01-2018 to 31-12-2018_v2.pdf
- GS 1340 - VPA 01-10 - ER_MP8_ v2.0(10).xlsx
- GS 1340 - VPA 01-10 - ER_MP9_ v4.0_.xlsx
- +8 more
validation
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →