GS1354 Vietnam Small Hydro PoA - Ta Trach Hydropower Project
GS-487 ↗ · current registry ID: GS2715
#1486of 1935 in Renewable energy#72of 80 in Vietnam#1448of 1801 in Gold Standard (GS)#1132of 1287 in ACM0002
Audit Analysis
The Ta Trach small hydro project has a VVB-verified investment additionality test and no reported reversal events, but is undermined by the absence of FPIC (per the 2022 PDD), a 0% leakage deduction supported only by a thin 'quantified' label, a project-specific baseline, and an unusually high volume of 34 corrective actions that reveal widespread documentation and calculation inconsistencies. Seven cross-document contradictions—including a 3.3× discrepancy in claimed ERR and conflicting FPIC status—further erode confidence in the project's data integrity.
Red Flags
- FPIC was not conducted per the 2022 PDD (contradicting the 2020 PDD which stated it was), a critical safeguard gap for a hydro project in Vietnam
- 34 corrective actions were required, spanning calculation errors, regulatory misreferences, and document misalignments, indicating substantial initial documentation weakness
- Claimed ERR of 312,275 tCO2e (2023) contradicts the 2020 PDD figure of 93,814 tCO2e — a 3.3× discrepancy with no verified ERR available to adjudicate
- 0% leakage deduction justified only by the label 'quantified' without a visible quantitative methodology in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 11,849 | 0 | 11,849 | |
| 2015 | 39,805 | 0 | 39,805 | |
| 2016 | 44,813 | 0 | 44,813 | |
| 2017 | 46,446 | 0 | 46,446 | |
| Total | 142,913 | 0 | 142,913 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, thin 'quantified' justification
Project-specific, reassessed 2021
Grievance & benefit sharing present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →