Skip to main content
GSEnergy Efficiency - DomesticCameroonGeneral Methodologyv2.1

GS1366 Micro Energy PoA, VPA 2 West Cameroon Improved Cookstoves

GS-526 ↗ · current registry ID: GS3071

#895of 1329 in Industrial#7of 9 in Cameroon#1313of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

A Gold Standard improved cookstove project in Cameroon with a present investment additionality test and matching claimed/verified ERR figures, but undermined by 16 material findings, 17 corrective actions, an unconfirmed VVB identity, a project-specific baseline with no reassessment record, and significant local stakeholder consultation gaps (one department for eight regions). The pro-rata delivery ratio (~233% of expectation) is conservative, but the volume of unresolved monitoring and governance deficiencies limits confidence in the underlying data.

Red Flags

  • 16 material findings and 17 corrective actions logged in the verification report, including missing sampling methodology, missing survey results, and missing signed carbon transfer forms
  • Local Stakeholder Consultation held in only one department for a project spanning eight regions, and the LSC meeting date coincided with the project start date, raising retroactive-approval concerns
  • VVB name not stated in any available document; additionality_verified_by_vvb is not confirmed
  • FNRB method contradicts between the monitoring report (local field measurement) and the PDD (national default), with the PDD dated 2020-10-14 — after the 2016 verification
  • Crediting period end date is not stated, making the full project lifetime and pro-rata calculations uncertain

Credit Vintages Exhausted

IssuedRetiredAvailable
2014
6546540
2015
1,5361,5360
2016
3033030
Total2,4932,4930

Risk Indicators

Additionality

Investment test present but VVB verification unconfirmed

Permanence

Energy-efficiency project; no reversal events reported

Leakage

0% deduction, deemed negligible, not quantified

Baseline

Project-specific baseline; no reassessment date recorded

Safeguards

FPIC and grievance mechanism present; LSC scope and timing concerns

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents