GS1366 VPA 14 Kilifi Borehole Rehabilitation Project
GS-1567 ↗ · current registry ID: GS7371
#834of 1329 in Industrial#100of 157 in Kenya#1234of 1801 in Gold Standard (GS)
Audit Analysis
The Kilifi Borehole Rehabilitation Project has documented safeguards, FPIC, and a grievance mechanism, but suffers from a critical over-crediting concern: total claimed credits (84,658) exceed the lifetime ex-ante estimate (50,000) by 69%. Multiple contradictions between the PDD and monitoring report on leakage treatment, crediting period, and additionality test type undermine data reliability. The project-specific baseline and absence of a confirmed buffer pool further weaken the integrity profile.
Red Flags
- Total claimed credits (84,658 per monitoring report, 2020-03) exceed the lifetime ex-ante estimate (50,000 per PDD) by 69%, indicating potential over-crediting beyond the project's design capacity
- Crediting period is stated as 2018–2024 in the monitoring report but 2014–2028 in the PDD — a 9-year discrepancy that fundamentally changes the pro-rata credit expectation
- Leakage justification is contradictory: the PDD (2019-10) describes leakage as 'quantified' while the monitoring report (2020-03) states it was 'deemed negligible' with a 0% deduction
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 7,589 | 7,589 | 0 | |
| Total | 7,589 | 7,589 | 0 |
Risk Indicators
Investment test present but VVB confirmation not stated
no reversal events but no permanence mechanism confirmed
0% deduction with contradictory justification across documents
Project-specific baseline; no reassessment date recorded
FPIC, grievance mechanism, and benefit sharing all documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →