Skip to main content
GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

GS1366 VPA 7 Kilifi Borehole Rehabilitation Project

GS-1408 ↗ · current registry ID: GS7129

#705of 1329 in Industrial#77of 157 in Kenya#1057of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.0
Documentation
5.0

Audit Analysis

A Gold Standard borehole rehabilitation project in Kenya with a reasonable additionality framework and documented safeguards, but undermined by significant contradictions between the PDD and monitoring report on ERR figures, leakage treatment, and crediting period. The absence of a named VVB, a project-specific baseline with no stated reassessment date, and no buffer pool limit confidence in the integrity of the credit claims.

Red Flags

  • ERR claimed in the monitoring report (84,658 tCO₂e) exceeds the lifetime ex-ante estimate (50,000 tCO₂e) by 69%, raising a serious over-crediting concern unless the monitoring figure covers a broader VPA scope than the individual project PDD
  • Leakage treatment is contradictory: the PDD (2019) describes leakage as 'quantified' while the monitoring report (2020) states it was 'deemed negligible' with a 0% deduction, with no reconciliation between the two
  • Crediting period differs by more than 9 years between the monitoring report (2018–2024) and the PDD (2014–2028), creating uncertainty about the actual validity window for issued credits
  • No VVB name is recorded in any available document, making independent verification of the additionality test and monitoring data impossible to confirm

Credit Vintages Exhausted

IssuedRetiredAvailable
2018
1,0551,0550
2019
10,00010,0000
Total11,05511,0550

Risk Indicators

Additionality

Investment test present but VVB verification unconfirmed; test type contradicted between PDD revisions

Permanence

no reversal events reported but risk unaddressed

Leakage

0% deduction with contradictory justifications between PDD and monitoring report

Baseline

Project-specific baseline; no reassessment date stated in available documents

Safeguards

FPIC, grievance mechanism, and benefit-sharing all documented

Double-claim

CORSIA and CCP statuses not stated in any available document

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents