Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS2397 - GS1265 - African Biomass Energy Conservation POA - Rwanda Biomass Conservation (2)

GS-321 ↗ · current registry ID: GS2397

#1069of 1329 in Industrial#99of 139 in Rwanda#1511of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.0
Transparency
5.0
Claim Safety
4.0
Documentation
3.5

Audit Analysis

This Gold Standard cookstove PoA in Rwanda has VVB-confirmed additionality and a quantified 29% leakage deduction, but is undermined by 14 material findings, 26 corrective actions, 11 cross-document contradictions, and a verified ERR figure that exceeds the lifetime ex-ante estimate. The absence of a stated buffer pool, a project-specific baseline last reassessed in 2013, and a 90.47% verified usage rate with no assumed baseline create meaningful over-crediting and permanence risks.

Red Flags

  • Verified ERR (387,394 tCO₂e) exceeds the lifetime ex-ante estimate (329,223 tCO₂e), indicating over-crediting of approximately 18% above the full-project expectation
  • No buffer pool percentage is stated in any available document, leaving permanence risk unmitigated for a cookstove project with inherent reversal risk
  • 14 material findings and 26 corrective actions span calculation errors, missing surveys, a breach of the small-scale VPA aggregate energy savings limit, and unresolved deviation requests
  • FNRB value contradicts between 0.98 (verification report, 2022) and 0.81 (monitoring report, 2022), a 21% discrepancy that materially affects emission reduction claims
  • Leakage deduction is inconsistent across documents: 29.07% in the 2022 verification report versus 10% in the 2020 monitoring report

Credit Vintages

IssuedRetiredAvailable
2013
7,4517,4510
2014
16,30016,017283
2015
52,48348,9433,540
2016
51,79347,4204,373
2017
24,15110024,051
2018
15,35113,5541,797
2019
7,2307,079151
Total174,759140,56434,195

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

cookstove reversal risk unaddressed

Leakage

29.07% quantified deduction

Baseline

Project-specific baseline; last reassessed 2013

Safeguards

FPIC and grievance mechanism per latest VR; contradicted in earlier docs; CARs outstanding

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents